[1] | 张廷楷 道路路线设计
|
[2] | [M] Washington, D C : AASHTO, 2001.
|
[3] | [M] 上海: 同济大学出版社,1990ZHANG TingkaiDesign of Roadway Alignment
|
[4] | [M]Shanghai:Tongji University Press, 1996
|
[5] | NA VIN F Reliability Indices for RoadGeometric Design
|
[6] | [J]Canadian Journal of Civil Engineering, 1992, 19(2): 760-766
|
[7] | NA VIN F Safety Factors for Road Design,CanThey be Estimated
|
[8] | [C]//Transportation Research Board 1280Washington, D C :TRB,National Research Council, 1990:181-189
|
[9] | EASA SReliability based Design of Intergreen Interval at Traf-fic Signals
|
[10] | [J] Journal of Transportation Engineering, 1993,119 (2) : 255-271
|
[11] | TIDWELL J E, HUMPHREYS J BRelation of Signalized Intersection Level of Service to Failure Rate and Average IndividualDelay
|
[12] | [C] //HighwayResearchRecord321Washington, D C : HRB, National Research Council, 1970, 32 (1) : 16-32
|
[13] | 张建仁, 张起森 公路工程结构可靠度理论及其应用
|
[14] | [M] 北京: 人民交通出版社, 1995 ZHANG Jianren, ZHANG QisengStructure Reliability Theoryand Application for Highway Engineering
|
[15] | [M] Beijing: Ch-ina Communications Press, 1995
|
[16] | ANG A H, TANG W HProbability Concepts in EngineeringPlanning and Design
|
[17] | [M] New York: John Wiley and Sons,1984
|
[18] | OLSON P L, ClEVELAND D E, FANCHER P S, et alParameters Affecting Stopping Sight Distance
|
[19] | [R] Washington,D C : Transportation Research Board, 1984
|
[20] | EASA STworegime Approximation to the Normal CumulativeFunction and Its Inverse
|
[21] | [R] Thunder Bay, Ontario: Lakehead University, 1992
|
[22] | 中华人民共和国交通部 JTG B01 2003 公路工程技术标准
|
[23] | [S] 北京: 人民交通出版社, 2003 P R ChinaMinistry of CommunicationsJTG B012003 Technical Standard for Highway Engineering
|
[24] | [S] Beijing: ChinaCommunications Press, 2003
|
[25] | 中华人民共和国交通部JTG D20 2006 公路路线设计规范
|
[26] | [S] 北京: 人民交通出版社, 2006 PR ChinaMinistry of CommunicationsJTG D20 2006 DesignSpecification for Highway Alignment
|
[27] | [S] Beijing: ChinaCommunications Press, 2006
|
[28] | AASHTOA Police on Geometric Design of Highways andStreets
|