[J]. 土木工程学报,2001,34 (3):7-12.CHENG Liangkui. Present Status and Development of Ground Anchorages
[3]
[J]. China Civil Engineering Journal,2001,34 (3):7-12.
[4]
沈俊,陈安敏,顾雷雨.宜兴抽水蓄能电站地下厂房锚杆承载力现场试验研究与计算方法
[5]
[J].岩石力学与工程学报,2004,23 (10):1735-1740.SHEN Jun,CHEN Anmin,GU Leiyu.In-situ Testing Study on Bearing Capacity of Rock Bolts and Corresponding Calculation Method
[6]
张思峰,宋修广,周健,等.预应力锚固结构耐久性及其二次加固技术研究
[7]
[J].公路交通科技,2008,25 (2):30-33.ZHANG Sifeng,SONG Xiuguang,ZHOU Jian,et al.Study on Durability and Secondary Reinforcement Technique of Prestressed Anchorage Structures
[8]
[J].Journal of Highway and Transportation Research and Development,2008,25 (2):30-33.
[9]
金爱兵,高永涛,蔡美凤,等.挡土墙加固工程锚杆预应力损失与补偿
[10]
[J].北京科技大学学报,2003,25 (31):199-202.JIN Aibing, GAO Yongtao, CAI Meifeng, et al.Prestress Losing and Compensate Method in the Reinforcement Project of Retaining Wall
[11]
[J].岩土力学,2010,31 (1):144-150.LI Yingyong,ZHANG Dingli,ZHANG Hongbo,et al.Research on Failure Mechanism and Effects of Prestressed Anchor Cables for Reinforcing Slopes
[12]
张思峰,周健,宋修广,等.预应力锚索锚固效应的三维数值模拟及其工程应用研究
[13]
[J].地质力学学报,2006,12 (2):166-173.ZHANG Sifeng,ZHOU Jian,SONG Xiuguang,et al.3D Numerical Simulation of the Anchor Effect of Prestressed Cables and Its Engineering Application
[14]
[J].Journal of Geomechanics,2006,12 (2):166-173.
[15]
[J].Chinese Jounal of Rock Mechanics and Engineering,2004,23 (10):1735-1740.
[16]
朱杰兵,韩军,程良奎,等.三峡永久船闸预应力锚索加固对周边岩体力学形状影响的研究
[17]
[J].岩石力学与工程学报,2002,21 (6):853-857ZHU Jiebing, HAN Jun, CHENG Liangkui, et al.Research on Rockmass Properties Near Anchor with Prestressing for TGP's Permanent Shiplock
[18]
[J].Chinese Jounal of Rock Mechanics and Engineering,2002,21(6):853-857.
[19]
宋修广,张思峰,李英勇路堑高边坡开挖、锚固数值模拟及稳定性分析
[20]
[J].公路交通科技,2005,22(4):38-40SONG Xiuguang,ZHANG Sifeng,LI Yingyong.Stability Analysis and Simulation of Excavation and Reinfforcement of High Slope of Expressway
[21]
[J].Journal of Highway and Transportation Research and Development, 2005, 22(4):38-40.
[22]
KIM N K. Performance of Tension and Compression Anchors in Weathered Soil
[23]
[J].Journal of Geotechnical and Geoenvironmental Engineering,2003, 129 (12):1138-1150.
[24]
曾宪明,陈肇元,王靖涛,等.锚固类结构安全性与耐久性问题探讨
[25]
[J].岩石力学与工程学报,2004,23 (13):2235-2242.ZENG Xianming,CHEN Zhaoyuan,WANG Jingtao,et al.Research on Safety and Durability of Bolt and Cablesupported Structures
[26]
[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23 (13):2235-2242.
[27]
唐树名,饶枭宇,张永兴公路边坡锚固失效模式及影响因素
[28]
[J].公路交通技术,2005 (5):26-28TANG Shuming, RAO Xiaoyu, ZHANG Yongxing.Anchorage Invalidation Models of Highway Slope and Influencing Factors
[29]
[J]. Technology of Highway and Transport,2005 (5):26-28.
[30]
[J].Journal of University of Science and Technology Beijing,2003,25(3):199-202.
[31]
汪鹏程,朱大勇,徐强.强震作用下加固边坡的动力响应及不同加固方式的比较研究
[32]
[J].合肥工业大学学报:自然科学版,2009,32 (10).1501-1504.WANG Pengcheng,ZHU Dayong,XU Qiang.Dynamic Response of Slopes Subjected to Intense Earthquakes and Effect Comparisonbetween Various Support Modes
[33]
[J].Journal of Hefei University of Technology:Natural Science Edition,2009,32 (10):1501-1504.