陈炜韬.厦门海底隧道陆域段土质围岩稳定性及预加固技术研究[D].成都:西南交通大学,2008.CHEN Weitao.Study on Stability and Pre-reinforcingTechnology of Soil Surrounding Rock in Land Segment ofXiamen Subsea Tunnel [D].Chengdu:SouthwestJjiaotong University,2008.
[2]
李昀,张子新,张冠军.泥水平衡盾构开挖面稳定模型试验研究[J].岩土工程学报,2007,29(7):1074-1079.LI Yun,ZHANG Zixin,ZHANG Guanjun.LaboratoryStudy on Face Stability Mechanism of Slurry Shields [J].Chinese Journal of Geotechnical Engineering,2007,29(7):1074-1079.
[3]
朱伟,秦建设,卢廷浩.砂土中盾构开挖面变形与破坏数值模拟研究[J].岩土工程学报,2005,27(8):897-902.ZHU Wei,QIN Jianshe,LU Tinghao.Numerical Study onFace Movement and Collapse around Shield Tunnels inSand [J].Chinese Journal of Geotechnical Engineering,2005,27(8):897-902.
[4]
秦建设.盾构施工开挖面变形与破坏机理研究[D].南京:河海大学,2006.QIN Jianshe.Study on Excavation Surface Deformation andCollapse of Earth Pressure Shield Tunnel [D].Nanjing:Hohai University,2006.
[5]
袁小会,韩月旺,郭涛.盾构施工中开挖面失稳数值分析[J].山西建筑,2007,33(9):336-337.YUAN Xiaohui,HAN Yuewang,GUO Tao.NumericalAnalysis of the Instability of Excavation Face in ShieldConstruction [J].Shanxi Architecture,2007,33(9):336-337.
[6]
黄正荣,朱伟,梁精华,等.浅埋砂土中盾构法隧道开挖面极限支护压力及稳定研究[J].岩土工程学报,2006,28(11):2005-2009.HUANG Zhengrong,ZHU Wei,LIANG Jinghua,et al.Study on Limit Supporting Pressure and Stabilization ofExcavation Face for Shallow Shield Tunnels in Sand [J].Chinese Journal of Geotechnical Engineering,2006,28(11):2005-2009.
[7]
ANAGNOSTOU G,KOVARL K.Face Stability in Slurryand EPB Shield Tunneling [J].Tunneling andUnderground Space Technology, 1996, 11(2):165-173.
[8]
程展林,吴忠明,徐言勇.砂基中泥浆盾构法隧道施工开挖面稳定性试验研究[J].长江科学院院报,2001,18,(5):53-55.CHEN Zhanlin, WU Zhongming, XU Yanyong.Experimental Study on Stability of Tunnel ExcavationSurface in Sand Foundation by Slurry Shield Method [J].Journal of Yangtze River Scientific Research Institute,2001,18(5):53-55.
[9]
CHAMBON P, CORTE J F.Shallow Tunnels inCohesionless Soil:Stability of Tunnel Face [J].Journalof Geotechnical Engineering, 1994, 120(7):1148-1165.
[10]
OHTA T,KIYA H.Experimental Study and NumericalAnalysis on Stability of Tunnel Face in Sandy Ground[J].Quarterly Report of RTRI, 2001, 42(3):156-160.
[11]
KIYA H,OHSHINMA H,ENOMOTO H.Classification ofLoosening Sandy Ground for Estimation of Tunnel FaceStability [J].Quarterly Report of RTRI,1991,5(6):39-46.
[12]
MAIR R J,TAYLOR R N.Bored Tunneling in the UrbanEnvironment [C] ∥ Proceedings of FourteenthInternational Conference on Soil Mechanics and FoundationEngineering.Brookfield,VT:AA Balkema Publishers,1999:2353-2385.
[13]
MAIR R J.Centrifuge Modelling of Tunnel Construction inSoft Clay [D].Cambridge:Cambridge University,1979.
[14]
王明年,陈炜韬,张磊,等.土质围岩开挖破坏模式研究[J].岩土力学,2010,31(8):2479-2483.WANG Mingnian,CHEN Weitao,ZHANG Lei,et al.Study of Failure Modes of Soil Surrounding Rock inExcavation [J].Rock and Soil Mechanics,2010,31(8):2479-2483.
[15]
王明年,李玉文.公路隧道围岩亚级分级方法[M].成都:西南交通大学出版社,2008.WANG Mingnian,LI Yuwen.Classification Method ofSurrounding Rock of Highway Tunnel [M].Chengdu:Southwest Jjiaotong University,2008.
[16]
于学馥.地下工程围岩稳定分析[M].北京:煤炭工业出版社,1983.YU Xuefu.Stability Analysis of Surrounding Rock ofUnderground Engineering [M].Beijing:China CoalIndustry Publishing House,1983.