[1] | AASHTO. Proposed AASHTO Guide for Design of Pavement Structures [R]. Washington, D. C. :American Association of State Highway and Transportation Officials,1985.
|
[2] | 查旭东,张起森. JC 法在柔性路面结构可靠度计算中的应用[J]. 土木工程学报,1996,29 (5): 49-56.ZHA Xu-dong,ZHANG Qi-sen. Application of JC Methodto Computation for the Reliability of Flexible Pavement[J]. China Civil Engineering Journal,1996,29 (5):49-56.
|
[3] | 陈佩林,梁锡三. 用蒙特卡罗法分析沥青路面结构的可靠度[J]. 广东公路交通,1998 (1): 24-27.CHEN Pei-lin,LIANG Xi-san. Use Monte Carlo Methodto Analyze the Reliability of Asphalt Pavement Structure[J]. Guangdong Highway Communications,1998 (1):24-27.
|
[4] | 桂劲松,康海贵. 结构可靠度分析的响应面法及其MATLAB 实现[J]. 计算力学学报,2004,21 (6):683-687.GUI Jin-song,KANG Hai-gui. Response Surface Method for Structure Reliability Analysis and Its Realization with Matlab
|
[5] | [ J ]. Chinese Journal of Computational Mechanics,2004,21 (6): 683-687.
|
[6] | 胡霞光,田莉,王秉纲. 沥青路面结构遗传算法优化研究[J]. 重庆交通学院学报,2002,21 (3): 21-25.HU Xia-guang,TIAN Li,WANG Bing-gang. Researchon Advanced Genetic Algorithm in Structure Optimization of Asphalt Pavement [J]. Journal of Chongqing Jiaotong University,2002,21 (3): 21-25.
|
[7] | 王祺国,徐旭. 响应面方法在路面可靠度分析中的应用[J]. 中外公路,2006,26 (4): 62-65.WANG Qi-guo,XU Xu. Application of Response Surface Method in Reliability Analysis of Pavement Structure [J].Journal of China & Foreign Highway,2006,26 (4):62-65.
|
[8] | 徐旭,王祺国. 基于数值模拟的沥青路面结构可靠度分析[J]. 公路交通科技,2008,25 (5): 18-22.XU Xu,WANG Qi-guo. Analysis of the Reliability of Asphalt Structure Based on Numerical Simulation [J].Journal of Highway Traffic Science and Technology,2008,25 (5): 18-22.
|
[9] | 徐旭,陈琴. 维修措施对沥青路面结构可靠度的影响研究[J]. 中外公路,2012,32 (2): 60-64.XU Xu, CHEN Qin. Research of Influence of Maintenance Measures on Reliability of Asphalt Pavement Structure [J]. Journal of China & Foreign Highway,2012,32 (2): 60-64.
|
[10] | ASAKURA Y, KASHIWADANI M. Road NetworkReliability Caused by Daily Fluctuation of Traffic Flow[C] ∥ Proceedings of the 19th PTRC Summer Annual Meeting. Brighton: PTRC,1991: 73-84.
|
[11] | BELL M G,LIDA Y. Transportation Network Analysis[M]. New York: John Willy and Sons, 1997:179-192.
|
[12] | CHEN A,RECKERW. Considering Risk Taking Behavior in Travel Time Reliability [C] ∥ Proceedings of 80thTransportation Research Board Annual Meeting.Washington, D. C. : Transportation Research Board,2000.
|
[13] | 王婧,何杰,吴炼. 雨天高速公路网行程时间可靠性评价方法[J]. 交通运输系统工程与信息,2011,11(6): 117-123.WANG Jing,HE Jie,WU Lian. Evaluating Approach ofTravel Time Reliability for Highway Network under Rain Environment [J]. Journal of Transportation Systems Engineering and Information Technology,2011,11 (6):117-123.
|
[14] | 吴炼,李旭宏,王婧,等. 雾天高速公路网行程时间可靠性评价方法[J]. 解放军理工大学学报,2010,11 (2): 233-238.WU Lian,LI Xu-hong,WANG Jing,et al. Reliability Evaluation on Travel Time in Freeway Network under Fog Environment Influence [J]. Journal of PLA University of Science and Technology,2010,11 (2): 233-238.
|
[15] | 张勇. 考虑路段关联失效的路网行程时间可靠性估计[J]. 土木工程学报,2008,41 (8): 87-92.ZHANG Yong. Estimation of Travel Time Reliability in Transportation Networks with Dependent Link Failures[J]. China Civil Engineering Journal,2008,41 (8):87-92.
|
[16] | 唐小勇,王炜,程琳. 交通网络旅行时间可靠度估计[J]. 土木工程学报,2007,40 (6): 84-88.TANG Xiao-yong,WANG Wei, CHENG Lin. Travel Time Reliability Assessment for Traffic Networks [J].China Civil Engineering Journal, 2007, 40 (6):84-88.
|
[17] | 徐旭,付蓉. 基于畅通可靠度的道路网络结构可靠度[J]. 上海大学学报,2012,18 (5): 448-453.XU Xu,FU Rong. Road Network Structural Reliability Based on Mobility Reliability [J]. Journal of Shanghai University,2012,18 (5): 448-453.
|
[18] | 徐旭,付蓉. 道路网络结构可靠度的研究[J]. 中外公路,2013,33 (1): 72-76.XU Xu, FU Rong. Research of Reliability of Road Network Structure [J]. Journal of China & Foreign Highway,2013,33 (1): 72-76.
|
[19] | 张雄飞,李瑞敏,李宏发,等. 基于Monte Carlo 的行程时间可靠性研究[J]. 武汉理工大学学报: 交通科学与工程版,2012,36 (4): 667-670.ZHANG Xiong-fei, LI Rui-min, LI Hong-fa, et al.Study on Travel Time Reliability Based on Monte Carlo Method [J]. Journal of Wuhan University of Science and Technology: Transportation Science & Engineering Edition,2012,36 (4): 667-670.
|
[20] | 刘建荣. 基于行程时间可靠性的路网通行能力研究[D]. 哈尔滨: 哈尔滨工业大学,2008.LIU Jian-rong. Research on Network Capacity Based on Travel Time Reliability [D]. Harbin: Harbin Institute of Technology,2008.
|
[21] | 付蓉. 基于网络的路面结构可靠度及优化分析[D].上海: 上海大学,2013.FU Rong. Analysis on Reliability and Optimization of Asphalt Pavement Structure Based on Network [D].Shanghai: Shanghai University,2013.
|