张望喜,易伟建,陈建阳,等. 斜拉桥索塔大吨位环向预应力束伸长量试验分析[J]. 中国公路学报,2002,15 (3): 57-60.ZHANG Wang-xi,YI Wei-jian,CHEN Jian-yang,et al.Experimental Analysis of the Extension of the Ring Prestressed Steel Bundle with Great Tonnage in the Concrete Tower of Cable-stayed Bridge [J]. China Journal of Highway and Transport,2002,15 (3): 57-60.
[2]
陶齐宇,大跨度斜拉桥预应力混凝土索塔关键问题研究[D]. 成都: 西南交通大学,2012.TAO Qi-yu. Study on Key Issues of PC Pylon of Long-span Cable-stayed Bridge [D]. Chengdu: Southwest Jiaotong University,2012.
[3]
常国强,伍波,刘亢,等. 索塔锚固区U 形环向预应力伸长量不均匀性探讨[J].重庆交通大学学报: 自然科学版,2009,28 (5): 826-829.CHANG Guo-qiang,WU Bo,LIU Kang,et al. Discussion on Non-uniformity of U-looped Prestressing Tendons Elongation at Tower Anchorage Zone [J]. Journal of Chongqing Jiaotong University: Natural Science Edition,2009,28 (5): 826-829.
[4]
李媛,付金璐. 邯武斜拉桥塔环向预应力筋张拉试验研究[J]. 石家庄铁道大学学报: 自然科学版,2010,23 (3): 53-56.LI Yuan, FU Jin-lu. Circular Prestress Tension Experiment for Tower of Cable-stayed Bridge [J]. Journal of Shijiazhuang Tiedao University: Natural Science Edition,2010,23 (3): 53-56.
[5]
陈建阳,徐国平. 大吨位小半径环向预应力在斜拉桥索塔锚固区中的应用研究[J]. 桥梁建设,2001(2): 12-15.CHEN Jian-yang, XU Guo-ping. The Research of Application of the Looped Prestressed Tendons with Large Tonnage and Small Radius in the Anchorage Zone of Cable-stayed Bridge Tower [J] Bridge Construction,2001(2): 12-151.
[6]
熊守富. 天津南仓斜拉桥索塔锚固区U 形环向预应力施工控制研究[J]. 桥梁建设,2011 (2): 71-75.XIONG Shou-fu. Research of Construction Control of UShape Loop Prestressing in Anchorage Zone in Pylon of Nancang Cable-stayed Bridge in Tianjin [J]. Bridge Construction,2011 (2): 71-75.
[7]
唐红元,孟少平,刘钊. 斜拉桥索塔锚固区双层U 形预应力束的张拉控制试验研究[J]. 公路交通科技,2006,23 (1): 56-59.TANG Hong-yuan, MENG Shao-ping, LIU Zhao.Experimental Study on Tension Control of Double UTendons in Anchorage Zone of Cable-stayed Bridge Pylon[J]. Journal of Highway and Transportation Research and Development,2006,23 (1): 56-59.
[8]
万利军,单炜. 大吨位小半径环向预应力钢束张拉伸长量综合分析法[J]. 公路交通科技,2011,28(6): 97-102.WAN Li-jun, SHAN Wei. Comprehensive Analytical Method of Tensioning Elongation of Great Tonnage and Small Radius Annular Prestressing Tendons [J]. Journal of Highway and Transportation Research and Development,2011,28 (6): 97-102.
[9]
程海潜. PC 弯曲孔道内接触应力、预应力摩阻损失及张拉伸长量研究[D]. 武汉: 武汉理工大学,2011.CHENG Hai-qian. Research on Contact Stress, Prestressed Frictional Loss and Elongation in PC Bending Duct[D]. Wuhan: Wuhan University of Technology,2011.
[10]
唐红元. 斜拉桥预应力混凝土索塔关键问题研究[D]. 南京: 东南大学,2006.TANG Hong-yuan. Study on Key Problems of Cable-stayed Bridge PC Pylon [D]. Nanjing: Southeast University,2006.
[11]
刘军进,潘宠平,吴宇波,等. 宜昌预应力卵形消化池摩阻损失及张拉伸长值实测[J]. 特种结构,2008,25 (4): 17-20.LIU Jun-jin,PAN Chong-ping,WU Yu-bo,et al. The Site Measurement of the Friction Loss and the Elongation Value of the Prestressing Tendons in the Project of Yichang Egg-shaped Sludge Digester [J]. Special Structures,2008,25 (4): 17-20.
[12]
蒋元勇. 南水北调中线穿黄工程二次衬砌预应力环形张拉施工技术[J]. 隧道建设,2013,33 (4): 305-308.JIANG Yuan-yong. Technology for Circular Pre-stress Tensioning of Secondary Lining of Tunnels: Case Study on Yellow River-crossing Tunnel on Central Route of South-tonorth Water Transfer Project [J]. Tunnel Construction,2013,33 (4):305-308.