扁坦超大断面小净距隧道支护结构的力学性状

, PP. 89-94

Keywords: 隧道工程,超大断面小净距隧道,数值模拟,双侧壁法,力学性状

Full-Text   Cite this paper   Add to My Lib

Abstract:

超大断面软弱围岩小净距隧道跨度大、埋深浅、施工步骤多、中间岩柱受力复杂、围岩稳定性差。为了研究适合于浅埋软弱围岩超大断面小净距隧道施工的工法,采用有限差分软件FLAC-3D对其施工过程进行数值模拟,模拟研究8车道超小净距隧道Ⅴ级围岩条件下的双侧壁法、三台阶法和CRD法施工过程,揭示该隧道在施工过程中的围岩变形规律、中间岩柱和支护结构受力性状,优化施工方案。模拟研究结果表明,与三台阶法和CRD法相比,采用双侧壁法施工时隧道围岩塑性区和中间岩柱塑性区最小,锚杆轴力最小,围岩变形较小,该法适合于弱软围岩超大断面小净距隧道施工。双侧壁法施工时的围岩变形规律和支护结构受力性状的数值模拟结果与现场监测结果基本一致,从而进一步验证了数值模拟分析结果的可靠性。

References

[1]  段慧玲,张林,大跨度公路隧道合理开挖方法对比研究[J],土木工程学报,2009,42(9):114-119,DUAN Huiling,ZHANG Lin,Comparative Study of Rational Excavation Methods for Large-span Highway Tunnels[J],China Civil Engineering Journal,2009,42(9):114-119.
[2]  章慧健,仇文革,冯冀蒙,小净距隧道夹岩力学特征分析[J],岩土工程学报,2010,32(3):434-439,ZHANG Huijian,QIU Wenge,FENG Jimeng,MechanicalPerformance of Shared Rock of Neighborhood Tunnels[J],Chinese Journal of Geotechnical Engineering,2010,32(3):434-439.
[3]  安永林,史胜利,彭立敏,等,隧道浅埋软弱围岩段双下侧导坑施工性态[J],公路交通科技,2009,26(1):114-119,AN Yonglin,SHI Shengli,PENG Limin,et al,Construction Behavior of Double Down-side Drifts in a Weak Tunnel with Shallow Cover[J],Journal of Highway and Transportation Research and Development,2009,26(1)114-119.
[4]  龚建伍,夏才初,朱合华,等,鹤上大断面小净距隧道施工方案优化分析[J],岩土力学,2009,30(1):236-240,GONG Jianwu,XIA Caichu,ZHU Hehua,et al,Optimal Analysis of Construction Schemes for Heshang Small-space Tunnels with Large Section[J],Rock and Soil Mechanics,2009,30(1):236-240.
[5]  姚勇,何川,谢卓雄,双线小净距隧道中岩墙力学特征及加固措施研究[J],岩土力学,2007,28(9):1883-1888,YAO Yong,HE Chuan,XIE Zhuoxiong,Study of Mechanical Behavior and Reinforcing Measures of Middle Rock Wall of Parallel Tunnel with Small Interval[J],Rock and Soil Mechanics,2007,28(9):1883-1888.
[6]  尹光志,曹多阳,李铃,复杂地质条件下隧道围岩和支护稳定性分析[J],湖南科技大学学报:自然科学版,2007,22(2):65-67,YIN Guangzhi,CAO Duoyang,LI Ling,Research on the Stability of Surrounding Rock Mass and Consolidating Structure of Tunnel under Complex Geological Condition[J],Journal of Hunan University of Science&Technology:Natural Science Edition,2007,22(2):65-67.
[7]  夏才初,龚建伍,唐颖,等,大断面小净距公路隧道现场监测分析研究[J],岩石力学与工程学报,2007,26(1):44-50,XIA Caichu,GONG Jianwu,TANG Ying,et al,Study on Site Monitoring of Large-section Highway Tunnels with Small Clear Spacing[J],Chinese Journal of Rock Mechanics and Engineering,2007,26(1):44-50.
[8]  CAI M,KAISER P K,Assessment of Excavation Damaged Zone Using a Micromechanics Model[J],Tunnelling and Underground Space Technology,2005,20(4):301-310.
[9]  GALLI G,GRIMALDI A,LEONARDI A,Three-dimensional Modeling of Tunnel Excavation and Lining
[10]  [J ],Computers and Geotechnics,2004,31:171-183.
[11]  NG C W,LEE K M,TANG D K W,Three-dimensional Numerical Investigations of New Austrian Tunneling Method(NATM)Twin Tunnel Interactions[J],Canadian Geotechnical Journal,2004,41(3):523-539.
[12]  周丁恒,曲海锋,蔡永昌,等,特大断面大跨度隧道围岩变形的现场试验研究[J],岩石力学与工程学报,2009,28(9):1773-1782 ZHOU Dingheng,QU Haifeng,CAI Yongchang,et al,In-situ Test on Surrounding Rock Deformation in Super-large Section And Large-span Tunnel[J],Chinese Journal of Rock Mechanics and Engineering,2009,28(9):1773-1782.