张开银,张军辉,梁新宇,等. 某斜拉桥的病害成因及加固研究[J]. 交通科技,2008,229 (4): 25 -28.ZHANG Kai-yin,ZHANG Jun-hui,LIANG Xin-yu,et al. The Cable-stayed Bridge Disease Test and Cause Analyses and Reinforcement Research [J]. Transportation Science & Technology,2008,229 (4): 25-28.
[2]
汪劲丰,施笃铮,徐兴. 确定斜拉桥最优恒载索力方法的探索[J]. 浙江大学学报: 工学版,2002,36(2): 152-155.WANG Jin-feng, SHI Du-zheng, XU Xing.Exploration of the Optimal Cable Tension of Cable-stayed Bridge under Permanent Loads [J]. Journal of Zhejiang University: Engineering Science Edition,2002,36 (2):152-155.
[3]
陈云海,陈可,吕建鸣. PC 斜拉桥辅助墩摆索拉力支座恢复加固施工控制分析[J]. 公路交通科技,2011,28 (4): 79-83.CHEN Yun-hai,CHEN Ke,L Jian-ming. Analysis of Construction Control for Rehabilitation of Tension Rocker Bearing of Subsidiary Piers in PC Cable Stayed Bridge[J]. Journal of Highway and Transportation Research and Development,2011,28 (4): 79-83.
[4]
吕建鸣,宋建永. 组合截面桥梁结构计算方法研究[J]. 公路交通科技,2005,22 (6): 68-71.L Jian-ming,SONG Jian-yong. Study on Analysis Method for Co-section Bridge Structure [J]. Journal of Highway and Transportation Research and Development,2005,22 (6): 68-71.
[5]
JTG D62-2004,公路钢筋混凝土及预应力混凝土桥涵设计规范[S].JTG D62-2004,Code for Design of Highway Reinforced Concrete and Prestressed Concrete Bridges and Culverts [S].
[6]
李宏江. 用于结构状态判别的PC 斜拉桥温度效应[J]. 土木建筑与环境工程,2009,31 (5): 81-85.LI Hong-jiang. Temperature Effect Analysis for Structural State Estimation of PC Cable-stayed Bridge[J]. Journal of Civil,Architectural & Environmental Engineering,2009,31 (5): 81-85.
[7]
陈云海,李宏江,吕建鸣. PC 斜拉桥辅助墩摆索拉力支座恢复后的索力调整[J]. 公路交通科技,2012,29 (6): 87-92.CHEN Yun-hai,LI Hong-jiang,L Jian-ming. Cable Force Adjustment after Rehabilitation of Tension Rocker Bearing of Subsidiary Piers in a PC Cable-stayed Bridge[J]. Journal of Highway and Transportion Research and Development,2012,29 (6): 87-92.
[8]
李宏江,王江,张永明,等. 天津永和斜拉桥换索后的索力调整[J]. 公路交通科技,2008,25 (10):79-83.LI Hong-jiang,WANG Jiang,ZHANG Yong-ming ,et al. Cable Force Adjustment after Cable Replacement for Tianjin Yonghe Cable-stayed Bridge [J]. Journal of Highway and Transportation Research and Development,2008,25 (10): 79-83.
[9]
吕建鸣,陈云海. 预应力混凝土桥梁徐变计算方法的研究[J]. 公路交通科技,2005,22 (7): 58-63.L Jian-ming,CHEN Yun-hai. Study of Analysis Method for PC Bridge Creep [J]. Journal of Highway and Transportation Research and Development, 2005, 22(7): 58-63.
[10]
JTJ 027—96,公路斜拉桥设计规范[S].JTJ 027—96,Design Specifications of Highway Cable Stayed Bridge [S].
[11]
李宏江,李万恒,张劲泉,等. 既有PC 斜拉桥合龙段拆除的施工控制[J]. 公路交通科技,2008,25(8): 61-66.LI Hong-jiang,LI Wang-heng,ZHANG Jin-quan,et al. Construction Control for Removal of the Closure Segment in an Existing Prestressed Concrete Cable-stayed Bridge [J]. Journal of Highway and Transportation Research and Development,2008,25 (8): 61-66.
[12]
王标,王艳,常全军. 大跨径PC 斜拉桥施工监控分析[J]. 交通科技与经济,2010,12 (1): 76-79.WANG Biao, WANG Yan, CHANG Quan-jun.Construction Control of Long-span PC Cable-stayed Bridge [J]. Technology & Economy in Areas of Communications,2010,12 (1): 76-79.