Brucker P, Knust S, Schoo A, et al. A Branch and Bound Algorithm for Resource-Constrained Project Scheduling Problem. European Journal of Operational Research, 1998, 107(2): 272-288
[2]
Mingozzi A, Maniezzo V, Ricciardelli S, et al. An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation. Management Science, 1998, 44(5): 714-729
[3]
Sprecher A, Drexl A. Multi-Mode Resource-Constrained Project Scheduling by a Simple, General and Powerful Sequencing Algorithm. European Journal of Operational Research, 1998, 107(2): 431-450
[4]
JóZefowska J, Mika M. Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling. Annals of Operations Research, 2001, 102(1): 137-155
[5]
Bouleimen K, Lecocq H. A New Efficient Simulated Annealing Algorithm for the Resource-Constrained Project Scheduling Problem and Its Multiple Mode Version. European Journal of Operational Research, 2003, 149(2): 268-281
[6]
Hartmann S. Project Scheduling with Multiple Modes: A Genetic Algorithm. Annals of Operations Research, 2001, 102(1/2/3/4): 111-135
[7]
Kolisch R, Hartmann S. Experimental Investigation of Heuristics for Resource-Constrained Project Scheduling: An Update. European Journal of Operational Research, 2006, 174(1): 23-37
[8]
Jiao Licheng, Du Haifeng. Development and Prospect of the Artificial Immune System. Acta Electronica Sinica, 2003, 31(10): 1540-1548 (in Chinese) (焦李成,杜海峰.人工免疫系统进展与展望.电子学报, 2003, 31(10): 1540-1548)
[9]
Project Scheduling Problem Library: PSPLIB [DB/OL]. [2007-10-27]. http://129.187.106.231/psplib/
[10]
Liu Shixin, Wang Mengguang, Nie Yiyong. Optimization Algorithm for Solving Multi-Mode Resource-Constrained Project Scheduling Problem. Journal of Systems Engineering, 2001, 16(1): 55-60 (in Chinese) (刘士新,王梦光,聂义勇.多执行模式资源受限工程调度问题的优化算法.系统工程学报, 2001, 16(1): 55-60)