Wang J. Constraint-based schedule repair for product development projects with time-limited constraints[J]. International Journal of Production Economics, 2005(95): 399-414. [2] 杨波,黄可正,孙红卫. 面向并行工程的任务分配与规划[J]. 计算机集成制造系统,2002,8(7): 542-545, 560. (YANG Bo, HUANG Kezheng, SUN Hong. Assignment and planning of task supporting concurrent engineering[J]. Computer Integrated Manufacturing Systems, 2002,8(7): 542-545, 560.) [3] 黄洪钟,李丽,刘伟. 并行工程中设计任务的动态调度[J]. 机械工程学报, 2002, 38(Supp):164-167. (HUANG Hongzhong, LI Li, LIU Wei. Dynamic scheduling of design tasks in concurrent engineering[J]. Chinese Journal of Mechanical Engineering, 2002, 38(Supp):164-167.) [4] Bassett M. Assigning projects to optimize the utilization of employees' time and expertise[J]. Computers & Chemical Engineering, 2000, (24): 1013-1021. [5] 陈传波,赵伟伟. 一种自主工作流任务分配策略[J]. 华中科技大学学报(自然科学版),2005, 33(6): 20-22. (CHEN Chuanbo, ZHAO Weiwei. Strategy for a task assignment of workflow system[J]. J. Huazhong Univ. of Sci. & Tech.(Nature Science Edition), 2005, 33(6): 20-22.) [6] 李玉家, 胡宗武, 金烨. 并行产品开发过程中的任务分配问题研究[J]. 中国机械工程, 2002,13(7): 46-49. (LI Yujia, HU Zongwu, JIN Ye. Research on task distribution in concurrent product development[J]. China Mechanical Engineering, 2002, 13(7): 46-49.) [7] 蒋增强, 刘明周, 赵韩, 等. 基于多目标优化的产品协同开发任务调度研究[J]. 农业机械学报, 2008, 39(3): 154-162. (JIANG Zengqiang, LIU Mingzhou, ZHAO Han, et al. Task scheduling of product cooperative development based on multi-objective optimization[J]. Transactions of the Chinese Society of Agricultural Machinery, 2008, 39(3): 154-162.) [8] 何泳生, 何勇. 粮食产后系统评判方法的探讨[J]. 农业工程学报, 1991, 7(1): 9-17. (HE Yongsheng, HE Yong. Study on comprehensive appraise method of grain postproduction system[J]. Transactions of CSAE, 1991, 7(1): 9-17.) [9] 焦立新. 评价指标标准化处理方法的探讨[J]. 安徽农业技术师范学院学报, 1999, 13(3): 7-10. (JIAO Lixin. On methods of standardization management of index[J]. Journal of Anhui Agrotechnical Teachers College, 1999, 13(3): 7-10.) [10] 董景峰, 王刚, 吕民, 等. 基于改进蚁群算法的多供应商选择问题求解[J]. 计算机集成制造系统, 2007, 13(8): 1639-1644. (DONG Jingfeng, WANG Gang, LV Min, et al. Multi-supplier selection problem solution based on improved ant colony algorithm[J]. Computer Integrated Manufacturing Systems, 2007, 13(8): 1639-1644.)