(Jiang D K, Li B, Tan J Y. Integrated optimization approach for order assignment and scheduling problem[J]. Control and Decision, 2013, 28(2): 217-222.)
[10]
Hall N G, Potts C N. The coordination of scheduling and batch deliveries[J]. Annual of Operations Research, 2005, 135(1): 41-64.
[11]
Chen Zhilong, Pundoor G. Order assignment and scheduling in a supply chain[J]. Operations Research, 2006, 54 (3): 555-572.
(Jiang D K, Li B. Multi-plant supply chain scheduling with parallel machines based on taboo search algorithm[J]. China Mechanical Engineering, 2012, 23(6): 688-693.)
[14]
Chen Zhilong, Li Chunglun. Scheduling with subcontracting options[J]. IIE Transactions, 2008, 40(12): 1171-1184.
(Chen R J, Zhang F, Tang G C. Scheduling with subcontracting options under parallel and open-shop machines[J]. J of Systems Engineering, 2011, 26(5): 649-655.)
(Chen R J, Tang G C. Supply chain scheduling with subcontracting options under uniform machines[J]. J of Systems Science and Mathematical Sciences, 2012, 32(1): 53-61.)
[19]
Lee Chungyee, Vairaktarakis G L, Minimizing makespan in hybrid flowshops[J]. Operations Research Letters, 1994, 16(3): 149-158.
[20]
Pinedo M L. Scheduling: Theory, algorithm, and systems[M]. New York: Springer, 2012.