某一转炉或精炼炉故障下炼钢-连铸生产重调度方法及应用

DOI: 10.13195/j.kzyjc.2014.1415, PP. 1921-1929

Keywords: 炼钢-连铸,重调度,设备故障,多重精炼,0-1混合整数规划

Full-Text   Cite this paper   Add to My Lib

Abstract:

炼钢-连铸生产中会出现某一台转炉或精炼炉故障,目前已有的重调度方法没有考虑多重精炼或只进行了仿真研究,难以有效应用到具有多重精炼的钢厂,而采用人工调整方式则容易导致炉次等待时间过长或断浇.为此,通过引入炉次生产状态参数,建立0-1混合整数规划重调度模型,提出由“未加工”炉次的设备指派、“未加工”炉次的开工时间优化和浇铸时间调整3部分组成的重调度方法.将该方法应用于某钢铁厂炼钢-连铸生产调度过程的实际工程应用验证了所提出方法的有效性.

References

[1]  Tang L X, Liu J Y, Rong A Y, et al. A mathematical programming model for scheduling steelmaking continuous casting production[J]. European J of Operational Research, 2000, 120(2): 423-435.
[2]  Harjunkoski I, Grossmann I E. A decomposition approach for the scheduling of a steel plant production[J]. Computers and Chemical Engineering, 2001, 25(11/12): 1647-1660.
[3]  Tang L X, Peter B Luh, Liu J Y, et al. Steel-making process scheduling using Lagrangian relaxation[J]. Int J of Production Research, 2002, 40(1): 55-70.
[4]  Pacciarelli D, Pranzo M. Production scheduling in a steelmaking-continuous casting plant[J]. Computers and Chemical Engineering, 2004, 28(12): 2823-2835.
[5]  Kumar V, Kumar S, Tiwari M K, et al. Auction-based approach to resolve the scheduling problem in the steel making process[J]. Int J of Production Research, 2006, 44(8): 1503-1522.
[6]  Bellabdaoui A, Teghem J. A mixed-integer linear programming model for the continuous casting planning[J]. Int J of Production Economics, 2006, 104(2): 260-270.
[7]  Tang L X, Xuan H. Scheduling a hybrid flowshop with batch production at the last stage[J]. Computers and Operations Research, 2007, 34(9): 2718-2733.
[8]  Atighehchian A, Bijari M, Tarkesh H. A novel hybrid algorithm for scheduling steel-making continuous casting production[J]. Computers and Operations Research, 2009, 36(8): 2450-2461.
[9]  Missbauer H, Hauberb W, Stadler W. A scheduling system for the steelmaking-continuous casting process: A case study from the steelmaking industry[J]. Int J of Production Research, 2009, 40(15): 4147-4172.
[10]  Pan Q K, Wang L, Mao K, et al. An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steelmaking process[J]. IEEE Trans on Automation Science and Engineering, 2013, 10(2): 307-322.
[11]  Mao K, Pan Q K, Pang X F, et al. A novel Lagrangian relaxation approach for a hybrid flowshop scheduling problem in the steelmaking-continuous casting process[J]. European J of Operational Research, 2014, 236(1): 51-60.
[12]  Aytug H, Lawley M A, McKay K, et al. Exectuing production schedules in the face of uncertainties: A review and some future directions[J]. European J of Operational Research, 2005, 161(1): 86-110.
[13]  Vieira G E, Hermann J W, Lin E. Rescheduling manufacturing systems: A framework of strategies, policies and methods[J]. J of Scheduling, 2003, 6(1): 36-92.
[14]  Ouelhadj D, Petrovic S. A survey of dynamic scheduling in manufacturing systems[J]. J of Scheduling, 2009, 12(4): 417-431.
[15]  Roy R, Adesola B A, Thornton S. Development of a knowledge model for managing schedule disturbance in steel-making[J]. Int J of Production Research, 2004, 42(18): 3975-3994.
[16]  Li T K, Guo D F. Constraint-based approach for steelmaking-continuous casting rescheduling[C]. Lecture Notes in Computer Science. Berlin: Springer, 2007: 1108-1117.
[17]  庞新富, 俞胜平, 张志宇, 等. 炼钢-连铸生产优化重调度方法[J]. 系统工程学报, 2010, 25(1): 98-103.
[18]  (Pang X F, Yu S P, Zhang Z Y, et al. Optimal rescheduling method for steelmaking-continuous casting[J]. J of Systems Engineering, 2010, 25(1): 98-103.)
[19]  Tang L X, Zhao Y, Liu J Y. An improved differential evolution algorithm for practical dynamic scheduling in steelmaking-continous casting production[J]. IEEE Trans on Evolutionary Computation, 2014, 18(2): 209-225.
[20]  王柏琳, 李铁克, 张春生, 等. 基于动态约束满足的考虑连铸机故障的炼钢连铸调度算法[J]. 计算机集成制造系统, 2011, 17(10): 2185-2194.
[21]  (Wang B L, Li T K, Zhang C S, et al. Dynamic CSP based scheduling algorithm for steelmaking and continuous casting with continuous caster breakdown[J]. Computer Integrated Manufacturing Systems, 2011,17(10): 2185-2194.)
[22]  朱道飞, 郑中, 高小强. 炼钢-连铸作业计划的遗传算法优化模型[J]. 钢铁, 2008, 43(7): 26-31.
[23]  (Zhu D F, Zheng Z, Gao X Q. Optimization model based on genetic algorithms for production planning of steelmaking and continuous casting process[J]. Iron and Steel, 2008, 43(7): 26-31.)
[24]  Mao K, Pan Q K, Pang X F, et al. An effective Lagrangian relaxation approach for rescheduling a steelmaking-continuous casting process[J]. Control Engineering Practice, 2014, 30: 67-77.
[25]  庞新富, 俞胜平, 罗小川, 等. 混合Jobshop 炼钢-连铸重调度方法及应用[J]. 系统工程理论与实践, 2012, 32(4): 826-838.
[26]  (Pang X F, Yu S P, Luo X C, et al. Hybrid job shop rescheduling method and its application for steelmaking-casting[J]. Systems Engineering-Theory & Practice, 2012, 32(4): 826-838.)
[27]  Benders J F. Partitioning procedures for solving mixed-variables programming problems[J]. Numerische Mathematik, 1962, 4(3): 238-252.
[28]  庞新富, 俞胜平, 柴天佑, 等. 炼钢-连铸调度计划调整过程中确定作业时间的优化调度模型[J]. 仪器仪表学报, 2008, 29(4S1): 389-394.
[29]  (Pang X F, Yu S P, Chai T Y, et al. Optimal model of ascertaining producing time and its application for schedule repairing in steelmaking-continuous casting[J]. Chinese J of Scientific Instrument, 2008, 29(4S1): 389-394.)