Gu Anzhong(顾安忠).Liquefied Natural Gas Technology(液化天然气技术)[M].Beijing:Machinery Industry Press,2004:3-15.
[2]
Gu Anzhong(顾安忠).Handbook of Liquefied Natural Gas Technology(液化天然气技术手册)[M].Beijing:Machi-nery Industry Press,2010.
[3]
Hu Jie(胡杰),Li Zhenyu(李振宇),Huang Gesheng(黄格省).Opportunity analysis and development advices on accelerating utilizing natural gas in low carbon age for China[J].Chemical Industry and Engineering Progress(化工进展),2013,32(10):2267-2273.
[4]
Wen Yonggang(温永刚),Chen Yunwen(陈运文),Fan Shuanshi(樊栓狮).Development of LNG vehicles techno-logy and its prospect of popularization and application[J]. Chemical Engineering of Oil & Gas(石油与天然气工业),2013,42(3):257-260.
[5]
Li Bing(李兵),Cheng Xiangjun(程香军),Chen Gongjian(陈功剑).Optimization of BOG treatment process in LNG terminal[J].Oil and Gas Treating and Process(油气加工),2012,30(5):27-30.
[6]
Yang Xiaodong(杨晓东),Gu Anzhong(顾安忠).Recovery of boil off gas generated from the storage transportation and production of LNG[J].Vacuum & Cryogenics(真空与低温),2000,6(4):191-194.
[7]
Wang Xiaoshang(王小尚),Liu Jingjun(刘景俊),Li Yuxing(李玉星).A case study of processing and opti-mization of BOG gas treatment in an LNG terminal in Qingdao[J].Nature Gas Industry(天然气工业),2014,34(4):125-130.
[8]
Yang Zhiguo(杨志国),Li Yajun(李亚军).Optimization of boil-off gas recondensation process in LNG receiving terminal[J].CIESC Journal(化工学报),2009,60(11):2876-2881.
[9]
Li Yajun(李亚军),Chen Meng(陈蒙).Simulation-based optimization and analysis of BOG multi-stage compression and recondensation process at LNG receiving terminal[J]. CIESC Journal(化工学报),2013,64(3):986-992.
[10]
Chen Ziru(陈子如),Xia Yunfeng(夏云峰),Yao Sansan(姚三三).Discussion on the feasibility of BOG recycling of LNG/LCNG station[J].Petroleum Products Application Research(石油商技),2014,(5):84-89.
[11]
Feng Boyuan(冯伯媛),Feng Xueyuan(冯雪源),Qu Ping(曲平).Recycling of BOG in combined LNG and CNG vehicle filling station[J].Gas & Heat(煤气与热力),2013,33(11):13-14.
[12]
Radebaugh R.Status and recent trends in cryocooler research//International Conference of Cryogenics & Refrigeration(ICCR)[C].ShangHai,2008:11-22.
Gromoll B,Huber N,Dietrich M,et al.Development of 25 K pulse tube refrigerator for future HTS-series products in power engineering//Cryogenic Engineering Conference(CEC22)[C].Keystone,Colorado,USA,2006:643-652.
[18]
Xu Y,Cai Y C,Sun D M,et al.Study on a High-Power Stirling Cryocooler[M].Boulder:ICC Press,2014:163-168.
[19]
Cai Y C,Xu Y,Sun D M,et al.Numerical Simulation of a High Power Stirling Cryocooler[M].Boulder:ICC Press,2014:177-183
[20]
Sun D M,Dietrich M,Thummes G.Investigation on High-power Stirling-type pulse tube coolers for cooling HTS Motors[J].IEEE Trans.on Applied Superconductivity,2012,22(3):4703704.
[21]
Shi Meizhong(史美中),Wang Zhongzheng(王中铮). Principle and Design of Heat Transfer Device(热交换器原理与设计)[M].Nanjing:Southeast University Press,2014.
[22]
Nusselt W.Surface condensation of water vapour[J]. Zeitschrift Des Vereines Deutscher Ingenieure,1916,(60):541-546.
[23]
Yang Shiming(杨世铭),Tao Wenquan(陶文铨).Heat Transfer(传热学)[M].Beijing:Higher Education Press,1998.