Zhu Huamin. General design of continuous channel girder of geshui creek railway bridge [J]. Bridge Design, 1996, 26(3): 49―51. (in Chinese)
[5]
陈铭. 铁路预应力混凝土连续槽形梁研究[J]. 铁道标准设计, 2009(6): 39―41.
[6]
Chen Ming. Study on prestressed concrete continuous trough girder railway bridge [J]. Railway Standard Design, 2009(6): 39―41. (in Chinese)
[7]
胡昌虎. 江汉航线青龙桥连续槽形梁施工技术[J]. 铁道标准设计, 2004(6): 47―49.
[8]
Hu Changhu. Construction technique of Continuous trough girder of Jianghan line Qinglong bridge [J]. Railway Standard Design, 2004(6): 47―49. (in Chinese)
[9]
胡匡璋, 王新元. 槽形梁[M]. 北京: 中国铁道出版社, 1987: 4―10.
[10]
Hu Kuangzhang, Wang Xinyuan. Trough girder [M]. Beijing: Chinese Railway Press, 1987: 4―10. (in Chinese)
[11]
Bruce Gibbens, Peter Selby Smith. Design-construction of sorell causeway channel bridge, hobart, tasmania [J]. PCI Journal, 2004, 49(3): 56―66.
[12]
陆光闾. 能量法解槽型宽梁的剪力滞问题[J]. 力学与实践, 1984, 6(1): 23―27.
[13]
Lu Guanglv. Solution on shear-lag effect of trough girder using energy method [J]. Mechanics and Application, 1984, 6(1): 23―27. (in Chinese)
[14]
倪元增. 槽型宽梁的剪力滞问题[J]. 土木工程学报, 1986, 19(4): 32―41.
[15]
Ni Yuanzeng. Shear-lag problem of wide trough girder [J]. China Civil Engineering Journal, 1986, 19(4): 32―41. (in Chinese)
[16]
周坚, 涂令康. 再论槽型宽梁的剪力滞[J]. 工程力学. 1994, 11(2): 65―75.
[17]
Zhou Jian, Tu Lingkang. Restudy on the shear lag in the wide-channel beams [J]. Engineering Mechanics, 1994, 11(2): 65―75. (in Chinese) 浏览