Wang Lin, Zeng Yurong, Gui Chao, et al. Application of artificial neural network supported by BP and particle swarm optimization algorithm for evaluating the criticality class of spare parts//ICNC 2007. Haikou: IEEE Computer Society Washington, 2007: 528-532.
[2]
李葆文. 设备备件库存结构及备件管理构想[J]. 设备管理与维修, 2004, 1(6): 6-8. Li Baowen. Design on device spare part inventory structure and management[J]. Plant Maintenance Engineering, 2004, 1(6): 6-8.
[3]
刘会永, 孟洛明. 传送网运行有效性评价模型[J]. 北京邮电大学学报, 2006, 29(4): 14-17. Liu Huiyong, Meng Luoming. Assessment model of the running availability of transport networks [J]. Journal of Beijing University of Posts and Telecommunications, 2006, 29(4): 14-17.
[4]
熊翱, 孟洛明. 基于容错机制高可靠性网管系统的研究[J]. 北京邮电大学学报, 2006, 29(2): 94-97. Xiong Ao, Meng Luoming. Study of high reliability network management system based on fault-tolerance mechanism[J]. Journal of Beijing University of Posts and Telecommunications, 2006, 29(2): 94-97.
[5]
刘会永. 电信网资源管理模型及应用[J]. 北京邮电大学学报, 2004, 27(sup): 1-8. Liu Huiyong. A management model and the application in telecom network resource[J]. Journal of Beijing University of Posts and Telecommunications, 2004, 27(sup): 1-8.
[6]
Diallo C, Ait-Kadi D, Chelbi A. (s,Q) Spare parts provisioning strategy for periodically replaced systems[J]. IEEE Transactions on Reliability, 2008, 57(1): 134-139.