Lachenbruch A H.Some estimates of the thermal effects of a heated pipeline in permafrost[J].Geological Survey Circular,Washington DC,1970,632:1-23.
[2]
Alyeska Pipeline Service Company.Federal and State Stipulations Governing the Trans Alaska Pipeline Systems[M].Fluor Alaska,Inc.,1974.
[3]
Pearn W H.Pipeline Design for Arctic and Subarctic Regions[R].Tulsa,Oklaham:Williams Brothers Engineering Co.,14 December,1970.
[4]
Alyeska Pipeline Service Company.Summary:Project Description of the Trans-Alaska Pipeline System[M].Alyeska Pipeline Service Company,1971.
[5]
Roscow J P.800 Miles to Valdez-the Building of the Alaska Pipeline[M].Englewood Cliffs,NJ:Prentice-Hall,Inc.,1977.
[6]
Coates P A:The Trans-Alaska Pipeline Controversy:Technology,Conservation and the Frontier[M].Fairbanks,AK:University of Alaska Press,1993.
[7]
Agreement and Grant of Right of Way for Trans-Alaska Pipeline between the USA,and the Original Permittees (Amerada Hess Co.,ARCO Pipe Line Co.,Exxon Pipeline Co.,Mobil Pipe Line Co.,Phillips Petroleum Co.,Sohio Pipe Line Co.,and Union Oil Co.of CA)[R].Washington DC,1973.