全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Case Analysis of the ZC Company’s AS Power Project Investment Decision-Making

DOI: 10.4236/ajibm.2015.511064, PP. 640-647

Keywords: Investment Decision, Benefit, Electrical Engineering, Risk, Investment Structure

Full-Text   Cite this paper   Add to My Lib

Abstract:

First, combined with relevant theories of modern investment decision-making, this paper took AS power engineering project of ZC Company for instance, analyzed objective function of power engineering investment structure in ZC Company. Second, this paper analyzed investment decision-making structure of AS power engineering project in ZC Company, and obtained specific results of investment decision-making, and the related results were verified. Through analysis and exploration, this paper has a scientific impact on ZC Company for the AS power project investment, while it’s hoped that it can play a role in electric power engineering projects of other companies in China. So it can better promote the development of electrical engineering investment in electrical industry.

References

[1]  Chen, Y.-L. (2008) Research on Investment Project Decision-Making and Method of Enterprise. Journal of Chongqing Institute of Technology (Sociology), 11, 56-59.
[2]  Ross, S.A. (1978) A Simple Approach to the Valuation of Risks Income Streams. Journal of Business, 51, 453-457.
[3]  Meng, Z. (2011) Investment Portfolio Study on Oil and Gas Exploration Project. China Petroleum University, Qingdao and Dongying.
[4]  Wang, L. (2007) Risk Causes and Control Countermeasures of Project Investment Decision-Making. Market Modernization, 7, 156-158.
[5]  Jia, G. (2008) Simply Makes Use of the Method of AHP in the Investment Decision-Making. Journal of Information Science and Technology, 23, 512-513.
[6]  Zhang, W.-G., Qin, M. and Chen, C.-W. (2011) Fuzzy Optimization Method of the Project Investment Portfolio. Journal of Management, 6, 938-942.
[7]  Marshall, J.F., Vipul and Bansal, K. (1992) Financial Engineering. Allan & Bacon Inc., New York.
[8]  Huang, X.-Q. (2011) Apply to Fuzzy Comprehensive Evaluation Method in Electric Power Engineering Project. Journal of Security Technology of Electric Power, 8, 23-27.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133