全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Inventory Management and Maintenance in Offshore Vessel Industry

DOI: 10.1155/2013/851092

Full-Text   Cite this paper   Add to My Lib

Abstract:

An evaluation of the inventory policy at an offshore vessel company was conducted. Currently the items in inventory are used at random intervals as they are used only when parts fail. To solve the problem of reducing a very large inventory but keep enough to allow an uninterrupted service to the customer, we propose a real and economically efficient multicriteria inventory policy using inventory classification method integrated with a preventive maintenance program. The proposed method can be summarized in the following three steps: first, rank the parts according to both the lead time from supplier and the cost of downtime failure and use a matrix display to show the most critical items. In the second step develop a preventive maintenance program for the most critical parts to minimize downtime due to failure. Finally in the third step standardize most critical parts to reduce the inventory which saves the company money while maintaining the same level of service to its customers. Our study showed that the company with a very large inventory could effectively reduce its size by focusing on key parts. 1. Introduction Due to the increasing pressure for remaining competitive in the global market place, inventory management has become a major challenge for companies to reduce costs and to improve customer service. Most manufacturing and service companies large or small have some type of inventory. The items in inventory are there to make the day-to-day operations of the company more efficient and the flow of goods smoother. While too much inventory reduces capital that can be directed into other aspects of the company’s operations, not enough causes other serious problems such as loss of sales and customer dissatisfaction. The challenge then becomes to effectively coordinate the overall inventory so the optimal amounts are maintained [1]. While working with an offshore vessel company, we have witnessed the problems regarding inventory first hand. The company provides service to oil and gas companies in the Gulf of Mexico. They lease a vessel from the company for a predetermined price set by the job the vessel will perform while under contract. If the vessel is not maintained correctly and breaks, then it becomes unusable. The unusable time becomes a downtime for the vessel, resulting in a loss of revenue. At times parts are hard to find because the vessels work from off the coast of Alabama to the southern coast of Texas, especially in an emergency situation where the vessel is in need to be repaired and returned to work right away. Therefore, there is an

References

[1]  R. Ballou, Business Logistics Management, Prentice Hall, Englewood Cliffs, NJ, USA, 5th edition, 2003.
[2]  T. Harris, “Optimized inventory management,” Production and Inventory Management Journal, vol. 38, no. 1, pp. 22–25, 1997.
[3]  H. H. Jordan, “Inventory management in the JIT age,” Production and Inventory Management Journal, vol. 29, no. 3, pp. 57–60, 1988.
[4]  L. Abuhilal, G. Rabadi, and A. Sousa-Poza, “Supply chain inventory control: a comparison among JIT, MRP, and MRP with information sharing using simulation,” Engineering Management Journal, vol. 18, no. 2, pp. 51–57, 2006.
[5]  V. A. Mabert, “The early road to material requirements planning,” Journal of Operations Management, vol. 25, no. 2, pp. 346–356, 2007.
[6]  R. Ramanathan, “ABC inventory classification with multiple-criteria using weighted linear optimization,” Computers and Operations Research, vol. 33, no. 3, pp. 695–700, 2006.
[7]  A. Hadi-Vencheh, “An improvement to multiple criteria ABC inventory classification,” European Journal of Operational Research, vol. 201, no. 3, pp. 962–965, 2010.
[8]  E. Kirche and R. Srivastava, “An ABC-based cost model with inventory and order level costs: a comparison with TOC,” International Journal of Production Research, vol. 43, no. 8, pp. 1685–1710, 2005.
[9]  A. Bhattacharya, B. Sarkar, and S. K. Mukherjee, “Distance-based consensus method for ABC analysis,” International Journal of Production Research, vol. 45, no. 15, pp. 3405–3420, 2007.
[10]  J. Hincapie, J. Lee, and W. Emblom, “Sensitivity analysis on inventory classification methods for oilfield equipment industry,” in Proceedings of the International Manufacturing Science and Engineering Conference, pp. 145–153, 2011.
[11]  Y. L. Ko?a?a and A. ?en, “Spare parts inventory management with demand lead times and rationing,” IIE Transactions, vol. 39, no. 9, pp. 879–898, 2007.
[12]  T. S. Vaughan, “Failure replacement and preventive maintenance spare parts ordering policy,” European Journal of Operational Research, vol. 161, no. 1, pp. 183–190, 2005.
[13]  J. Morelli, “ABCs of rectifier maintenance. A carefully planned preventative upkeep program can reduce unscheduled downtime,” Metal Finishing, vol. 107, no. 3, pp. 34–37, 2009.
[14]  A. Chelbi, D. Ait-Kadi, and H. Aloui, “Optimal inspection and preventive maintenance policy for systems with self-announcing and non-self-announcing failures,” Journal of Quality in Maintenance Engineering, vol. 14, no. 1, pp. 34–45, 2008.
[15]  N. Rezg, S. Dellagi, and A. Chelbi, “Joint optimal inventory control and preventive maintenance policy,” International Journal of Production Research, vol. 46, no. 19, pp. 5349–5365, 2008.
[16]  J. A. C. Duarte, J. C. T. A. Craveiro, and T. P. Trigo, “Optimization of the preventive maintenance plan of a series components system,” International Journal of Pressure Vessels and Piping, vol. 83, no. 4, pp. 244–248, 2006.
[17]  G. Toomey, “Harnessing the power of maintenance,” Power Engineering, vol. 110, no. 3, pp. 42–47, 2006.
[18]  C. M. I. Da Silva, C. M. P. Cabrita, and J. C. De Oliveira Matias, “Proactive reliability maintenance: a case study concerning maintenance service costs,” Journal of Quality in Maintenance Engineering, vol. 14, no. 4, pp. 343–355, 2008.
[19]  M. Kans, “The advancement of maintenance information technology: a literature review,” Journal of Quality in Maintenance Engineering, vol. 15, no. 1, pp. 5–16, 2009.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133