全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Evaluating Production Time Buffer for Precast Fabrication

Keywords: Fuzzy logic , precast , finished goods inventory , time buffer

Full-Text   Cite this paper   Add to My Lib

Abstract:

Precast fabricators strive for business success in delivering products on time. To achieve this goal, fabricators start manufacturing once they receive specific design information. However, this strategy induces wasteful inventory. The objective of this study is to develop a Time Buffer Evaluation Model (TBEM) to promptly deliver products and maintain a smaller inventory. This model consists of two stages. The first, by using fuzzy logic, considers factors that influence construction duration. The second stage evaluates a time buffer by considering the tardiness penalty and crashing costs. In this study, one real case is tested to demonstrate the applicability of the proposed method. The application results show that the developed TBEM can reduce the level of finished goods inventory without changing production resources.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133