Underground Parking structure built with deep foundations and vault precast elements in SpainKeywords: Underground parking structure , deep foundation , pile walls , erection sequence of structure , precast elements , vault structure , Aparcamiento subterráneo , cimentación profunda , pantalla de pilotes , secuencia de montaje , elementos prefabricados , bóveda Abstract: In many cases the only places available for the construction of a new car park are the existing streets or roads. These streets may also have important or historic buildings very close to the structure, which means that they cannot be disturbed in any way during the construction of the parking structure. In this particular case, the novelty is that the top deck is solved with a unique structure: a vault that interacts with the pile wall not only for vertical but also for horizontal loads due to the arch mechanism. The construction of the vault is solved as a large precast element of one piece of more than 16 in length and 2.40m in width, which is built in the factory, transported with the help of trucks and erected on site with large cranes. En muchos casos las únicas localizaciones para construir aparcamientos son las calles o carreteras. Estas calles también suelen tener alrededor importantes edificios históricos muy cercanos a la propia estructura. En este caso particular la novedad reside en que el forjado superior está resuelto con una estructura especial: una bóveda que interacciona con la pantalla de pilotes no solo en el sentido vertical sino también en el horizontal formando un verdadero mecanismo de arco. La construcción de la bóveda se ha resuelto con grandes elementos prefabricados de una pieza de más de 16m de longitud y de 2,40m de ancho. Se han fabricado en una factoría, transportados y montados en obra con grandes grúas.
|