全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
Metalurgija  2013 

Optimal replacement time estimation for machines and equipment based on cost function

Keywords: machine replacement time , estimation , cost function

Full-Text   Cite this paper   Add to My Lib

Abstract:

The article deals with a multidisciplinary issue of estimating the optimal replacement time for the machines. Considered categories of machines, for which the optimization method is usable, are of the metallurgical and engineering production. Different models of cost function are considered (both with one and two variables). Parameters of the models were calculated through the least squares method. Models testing show that all are good enough, so for estimation of optimal replacement time is sufficient to use simpler models. In addition to the testing of models we developed the method (tested on selected simple model) which enable us in actual real time (with limited data set) to indicate the optimal replacement time. The indicated time moment is close enough to the optimal replacement time t*.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133