全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

The technical requirements for operation of the Leica TCR 2003A automated total station in working conditions of the Mostecká uhelná company

Keywords: Leica TCR 2003A , automated total station , secure safe operational conditions

Full-Text   Cite this paper   Add to My Lib

Abstract:

Stability conditions of the southwest slopes at eskoslovenské armády mine operated by the Mostecká uhelná a.s. (Most mining company) are monitored by means of the Leica TCR 2003A automated total station. A new measuring site supplied with a system of measuring points were necessary to establish to put this station into operation. To secure safe operational conditions as well as to exclude any outer effects on the station were the main requests for designing this measuring system..

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133