全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

MFBLP Method Forecast for Regional Load Demand System

Keywords: Short term load forecasting (STLF) , autoregressive (AR) , Modified , Linear Predictor , Autoregressive moving average (ARMA) , Burg

Full-Text   Cite this paper   Add to My Lib

Abstract:

Load forecast plays an important role in planning and operation of a power system. Theaccuracy of this forecasted value is necessary for economically efficient operation andalso for effective control. This paper describes a method of modified forward backwardlinear predictor (MFBLP) for solving the regional load demand of New South Wales(NSW), Australia. The method is designed and simulated based on the actual load dataof New South Wales, Australia. The accuracy of discussed method is obtained andcomparison with previous methods is also reported.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133