全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

ANALISA PENJADWALAN DAN BIAYA PERAWATAN MESIN PRESS UNTUK PEMBENTUKAN KAMPAS REM

Keywords: scheduling , maintenance , maintenance cost

Full-Text   Cite this paper   Add to My Lib

Abstract:

Maintenance scheduling system is very important for a company to reduce total maintenance cost. Maintenace scheduling will be done on hydraulic seal and oil burner pipe that are components of press machine for hot forming process. Scheduling model will consider labor cost, production loss cost, and spare part cost. The aim of this model is to determine the interval of maintenance by optimizing cost. This calculation will reduce total maintenance cost between 35,07 % and 90,73 % of the previous total maintenance cost. Abstract in Bahasa Indonesia : Sistem penjadwalan perawatan mesin sangatlah penting bagi perusahaan untuk menekan biaya yang harus dikeluarkan. Penjadwalan perawatan akan dilakukan pada seal hydrolis yang merupakan komponen dari mesin press dan slang oil burner yang merupakan komponen mesin press untuk proses hot forming. Model perawatan yang digunakan akan memperhitungkan komponen-komponen biaya yang meliputi biaya tenaga kerja, biaya kehilangan produksi dan harga komponen. Model ini bertujuan untuk menentukan interval waktu perawatan dengan mengoptimalkan biaya. Dari hasil perhitungan dapat menekan biaya total berkisar antara 35,07% sampai 90,73% dari biaya total semula. Kata kunci: penjadwalan, perawatan mesin, biaya perawatan

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133