|
控制理论与应用 2002
Application of adding-weight one-rank local-region method in electric power system short-term load forecast
|
Abstract:
Adding-weight one-rank local-region method is introduced on chaotic time series. And this method is applied to the forecast of electric power system short-term load. Through the short-term load forecasting of a certain electric network in East China, the result is satisfied.