|
计算机应用研究 2011
Study on lot-splitting method for multi-objective flexible Job-Shop scheduling problem
|
Abstract:
Flexible size lot-splitting method,for multi-objective flexible Job-Shop scheduling problem,may produce irregular lot-splitting scheme.To resolve this problem,proposed the idea of regular lot-splitting.According to the rule of maximum batch size,it analysed the main factors which determined the best batch size.It presented a lot-splitting scheme that determined batch size by process time of each job.Experiment shows that main indexes of the scheme with different batch size,including make span,are better tha...