全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
海洋科学  2011 

Prediction of sediment souring and depositing driven by Zhangjiabu new port construction at Jinghai bay at Weihai
威海靖海湾港区张家埠新港建设对泥沙冲淤影响预测分析

Keywords: numerical model,joint action of wave and current,the maximum scouring depth,the critical shear stress
数值模拟
,波流共同作用,极限冲刷深度,临界起动剪切力

Full-Text   Cite this paper   Add to My Lib

Abstract:

In this paper, three-dimensional model ECOMSED was used to simulate the evolution of the seabed terrain under the condition of tide and wave (imposed by the wind), and to analyze the variation of scouring and depositing after the completion of Zhangjiabu new port construction at Jinghai bay at Weihai. The shear stress that imposed by the joint action of wave and current to the seabed, is equal with the critical stress of incipient motion of sediment, so that the variation of scouring and depositing can be analyzed. It was shown that the seabed was eroded badly near the open section of the approach embankment and the terminal of the breakwaters, where the maximum values of scouring depth for 50 and 25 years return period are up to 3.5 m and 2.9 m, respectively. This conclusion may provide reference data to protect against scouring.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133