全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
环境科学  2007 

Influencing Factors on Start-up Period in a Bioaugmented Membrane Bioreactor Using Genetically Engineered Microorganism (GEM)
基因工程菌生物强化膜-生物反应器工艺启动期影响因素研究

Keywords: bioaugmentation,GEM,MBR,atrazine,start-up period,influencing factors
生物强化
,基因工程菌,膜-生物反应器,阿特拉津,启动期,影响因素

Full-Text   Cite this paper   Add to My Lib

Abstract:

High and stable atrazine removal could be obtained after a start-up period in a membrane bioreactor (MBR) bioaugmented with genetically engineered microorganism (GEM) and the removal efficiency was above 90%. The shortest start-up period was 2 d and the longest one was 12 d under different conditions. Initial influent atrazine loading, operation temperature and initial population size of GEM affected the start-up period greatly. High initial influent atrazine loading, high operation temperature and large initial population size of GEM were favorable to shorten the start-up period. The characteristics of the influent had little effect on the start-up period. When other conditions were identical, two kinds of influents, synthetic wastewater and real domestic wastewater, had the same start-up periods. Moreover, after the start-up period, atrazine removal had also no difference with these two influents in the following stable period. Then it could be concluded that the characteristics of the influent influenced atrazine removal little not only in the start-up period but also in the stable period.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133