全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
环境科学  2006 

Relationship Between the Nitrogen Removal and Oxygen Demand in Constructed Wetlands
人工湿地氮转化与氧关系研究

Keywords: constructed wetlands,nitrification,denitrification,nitrogen oxygen demand
人工湿地
,硝化,反硝化,硝化需氧量

Full-Text   Cite this paper   Add to My Lib

Abstract:

A simplified model of sequential N transformations and sink was applied to investigate the relationship between the nitrogen removal and oxygen demand to verify the validity of full nitrification-denitrification mechanism in a newly-built multi-stages constructed wetlands. Average net rates of N mineralization ranged from 0.01 to 0.28 g x (m2 x d)(-1), nitrification from 0.50 to 1.54 g x (m2 x d)(-1), denitrification from 0.41 to 1.13 g x (m2 x d)(-1)(3.4% approximately 35.4% of measured N removal in different stage) and plant assimilation from 0.07 to 0.26 g x (m2 x d)(-1) in the five tanks. Nitrification and denitrification occurred concurrently with BOD removal, even in the first stage receiving the higher-strength wastewater. Surprisingly, net areal nitrification rates, was correlated with BOD removal rates positively. Nitrification rates were also correlated linearly with average NH4+-N concentrations in the cascade tanks. The nitrogenous oxygen demand (NOD) required to support full nitrification of ammonia and mineralized Org-N in the wetland was in the upper range of that expected to be able to be supplied through surface and plant-mediated oxygen transfer. Some potential alternative nitrogen removal pathways with reduced overall oxygen requirements that have relevance to constructed wetlands were discussed.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133