|
腐蚀科学与防护技术 2002
FAILURE ANALYSIS OF STEAM CONDENSER OF PTA PRODUCTION DEVICE AND PROTECTION METHOD
|
Abstract:
The corrosion of the first condenser of the PTA reactor in Yizheng chemical fibre factory has been investigated.The erosion of high temperature high pressure cooling liquid is the main reason for the perforation of the shell of the first condenser E-112.