全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

IN-SITU CALIBRATION OF BOREHOLE SHEAR STRAINMETER AT TAIAN STATION
泰安台钻孔差应变观测的实地标定

Keywords: Taian station,borehole shear strain observation,in-situ calibration,theoretical earth tide,time lag
泰安台
,钻孔差应变观测,实地标定,理论固体潮,时间滞后

Full-Text   Cite this paper   Add to My Lib

Abstract:

On the basis of operating principle and the observations by borehole shear strainmeter and by use of theoretical earth tide,a new method for in-situ calibration of borehole shear strainmeter at Taian station is presented.The results show that the data of shear strain 2 are reliable because the component 2 and 4 of shear strainmeter work normally.The calibration coefficients of component 3 are considerably fluctuant.The data of shear strain 1 and 2 agree with their theoretical values on the whole after in-situ calibration.The shear strain observations have to be calibrated in different periods of specific issues,as the calibration coefficients change with time.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133