全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

DATA PROCESSING IN PRECISION SURVEYING OF BALLASTLESS TRACK HIGH-SPEED RAILWAY
无碴轨道高速铁路精密测量数据处理

Keywords: ballastless track high-speed railway,adjustment of indirect observations,steady balancing adjustment,gross errors detection,variance component estimation
无碴轨道高速铁路
,间接平差,拟稳平差,粗差探测,方差分量估计

Full-Text   Cite this paper   Add to My Lib

Abstract:

A data processing method for the precision surveying of ballastless track high-speed railway is put forward:first, choosing the compatible points in the control network by quasi-stable adjustment, then, adjusting the control network with the adjustment model of indirect observation in which the Baarda gross errors detection and Helmert variance component estimation are used. This kind of software for precision surveying data processing has been developed and tested by use of real surveying data.The data processing results show that the adjustment accuracy and reliability of the control network can be improved with this method.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133