全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

PRACTICE ON SYNTHETIC GEOLOGICAL PREDICTION AHEAD OF CONSTRUCTION OF XIAMEN SUBSEA TUNNEL
厦门海底隧道综合超前地质预报实践

Keywords: subsea tunnel,geological prediction ahead,unfavourable geology,tunnel seismic prediction(TSP) detecting,synthetic prediction technique
海底隧道
,超前地质预报,不良地质体,TSP探测,综合预报技术

Full-Text   Cite this paper   Add to My Lib

Abstract:

In view of the actual situation that there is still not any systematic theory of geological prediction for the tunnel construction,the concept of geological prediction ahead of construction for the tunnel and technical scheme of geological prediction have been constructed on the basis of the previous research results;and a complete set of geological forecasting techniques including the macro forecast,the long-term prediction,the short-term prediction and the alarm of the disaster approach,have been proposed based on the theory of geomechanics. According to the practical test of the prediction in Xiamen subsea tunnel,the accuracy of the prediction can meet the requirements of the construction standards. It shows the rationality and feasibility of the related theory and the technical method;and the proposed technical method can provide some references to the tunnel constructions.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133