全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

NUMERICAL ANALYSIS OF FORMING MECHANISM OF CRACK IN STANDARDIZATION DIKE ON YELLOW RIVER IN DONGMING OF SHANDONG PROVINCE
山东东明黄河标准化堤防裂缝成因数值分析

Keywords: hydraulic structure engineering,the Yellow River,standardization dike,crack,reinforcing dike with silt,finite element method
水工结构工程
,黄河,标准化堤防,裂缝,淤背,有限单元法

Full-Text   Cite this paper   Add to My Lib

Abstract:

In the course of building the downstream standardization dike in Yellow River,the method of reinforcing dike with silt was adopted.By far,longitudinal cracks appear in the first stage project in Dongming of Shandong Province,which would endanger the safety of dike.It has huge complex impacts on dike body to reinforce dike with silt,and little study is carried out.There are no quantitative results about the forming cause of crack,so it is very difficult to prevent and deal with radically.By experiment on typical dike section,and theories and methods such as unsaturated seepage,liquid-solid coupling,soak deformation,finite element analysis and so on used to simulate the process of construction,the forming mechanism is analyzed and the main factors are discussed by analyzing several special working conditions.Study shows that the cracking course of dike body can be reflected by simulation;and the results are in accord with the fact.The main factors are reinforcing dike with silt,construction in high speeds,oak deformation,poor drainage,stacking load at the tip of dikei,mpact of vehicle and so on.The results can provide references to building the standardization dike and similar projects.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133