THE HYDRO-FRACTURING IN-SITU STRESS MEASUREMENT AND ANALYSIS FOR WANJIAZHAI KEY WATER CONTROL PROJECT
|
Abstract:
Hydrofracturing insitu stress mesasurements of three boreholes in Wanjiazhai key water control project have been carried out. The Maximum and the minimum horizontal stresses and the direction of the maximum horizontal stress are obtained. According to the test results, the stress state of this area is analyzed. The stability of the dam and the undergroundl pump station are discussed also.