北京;地铁;西单车站工程;环境维护;双眼镜法方案;施工工艺;支护体系;地下开挖;工程管理, Open Access Library" />

全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

ENVIRONMENTAL MAINTENANCE OF XIDAN STATION PROJECT OF BEIJING SUBWAY
北京地铁西单车站工程的环境维护

Keywords: environmental maintenance,underground engineering construction,北京&searchField=keyword">"Abinocular" scheme
北京
,地铁,西单车站工程,环境维护,双眼镜法方案,施工工艺,支护体系,地下开挖,工程管理

Full-Text   Cite this paper   Add to My Lib

Abstract:

In the construction of Xidan Station of Beijing Subway, a station which is located just under the busiest section of the City, the environmental maintenance constitutes both the cultural requirement of a modern city and the controlling factor of the engineering construction. A "binocular" scheme including layer-by-layer control of country rock and surface subsidence was adopted by the units in charge of designing and construction, in combination with the application of five major technological measures, i.e. roof protection by largepipe shed, grouting through small conduits, supporting with latticed railings, shoterete with hanged net, and country rock measurement, which composed a supporting system with strata controlling and surface subsidence, through which the problem of maintenance of environmental stability both surficial and underground in the process of excavation of the great cave of the station was statisfactorily solved. With the reinforcement of engineering management, the problem concerning the gardens and grasslands, environmental sanitation, noise pollution, appearance of city, and trade activity were also well solved, and the environment around the station was fully maintained. The experience about environmental maintenance in the Xidan Station project is thus worth for reference to all urban underground engineering constructions.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133