全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

DEM ANALYSIS ON THE THIRD PERIOD LONGITUDINAL COFFERDAM OF THE THREE GORGES UNDER BLAST LOADING
爆炸载荷下三峡三期纵向围堰响应的离散元分析

Keywords: blasting loading,The Three Gorges,vibration
碾压混凝土围堰
,爆炸载荷,离散元

Full-Text   Cite this paper   Add to My Lib

Abstract:

The responses of the second period RCC of Qingjiang under blasting loading are analyzed by DEM first. The material parameters are obtained by comparing the numerical results and those of the experiments. And then, with these material parameters and some data obtained from experiments, the decaying rules of the vibration velocities with distance and time of the three period longitudinal cofferdam of the Three Gorges under blasting loading are analyzed. It is shown that the vibration safety of blast dismantlement for the third period longitudinal cofferdam of the Three Gorges is the most important problem. Therefore, it is practical and important to study the responses of vibration of the third period longitudinal cofferdarn under blast loading.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133