STABILIZATION TECHNOLOGY ON THE HIGH-STEEP ROCK SLOPE IN THE THREE GORGES PROJECT SHIPLOCK
三峡永久船闸岩石高边坡工程稳定技术

Keywords: the Three Gorges Project,shiplock,high slope,stabilization,technology
永久船闸
,高边坡,稳定性

Full-Text   Cite this paper   Add to My Lib

Abstract:

The permanent shiplock is one of the main structures of TGP. The stability and deformation control of the shiplock slope are the key technical problems of the TGP. According to the characteristics of the slope, the technical path is discussed for the research, design and construction, and then the slope scale, rock support, drainage and seepage-prevention, construction procedures, blast control and monitoring measures during construction are presented. The conclusion is that the stability and deformation up to now have been controlled in the range of design.