OPTIMIZATION OF THE CONSTRUCTION SEQUENCE AND ANCHORING PARAMETERS IN THE LARGE UNDERGROUND CAVERN EXCAVATION OF SHUIBUYA PROJECT
水布垭大型地下厂房施工顺序和锚固参数优化分析研究

Keywords: hydraulic structure,Shuibuya water conservancy project,underground cavern,excavation,anchorage,optimization
清江
,水布垭水利枢纽,地下厂房,水工结构,开挖,锚固,优化

Full-Text   Cite this paper   Add to My Lib

Abstract:

The large underground main powerhouse of Shuibuya water conservancy project is located at interlacing of soft rock and hard rock,and the stability of the cavern will have significance for safe operation of the hydropower station. 3D nonlinear FEM numerical simulations considering of different construction steps and anchoring parameters have been performed. Comparising the numerical results,the optimal scheme of construction sequence and anchorage parameters of the cavern is suggested,and this scheme can keep the stability of cavern well.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133