|
岩石力学与工程学报 2001
PILE PULLING TEST STUDY OF LARGE DIAMETER PILE ANCHOR IN ROCK
|
Abstract:
On the basis of the in situ data of two piles anchor in No.2 Luzhou Changjiang bridge, the vertical pulling bearing behavior and the law of variation in skin friction are analyzed, and some conclusions are obtained to have guidable significance for design and construction of engineering.