Study on Construction Schedule Management and Control Method for Hydraulic & Hydropower Engineering Based on Visual Simulation
|
Abstract:
Analysis and control of construction schedule based on visual dynamic simulation is studied in this paper.The methodology of visual dynamic simulation for construction schedule is presented in this thesis,visualization of founding model,calculating and result of schedule simulation is realization;schedule analysis and optimizing integrated with soft network plan technology is presented,including project time analysis and resource optimization on the base of that,construction schedule real time management and control method based on visual dynamic simulation is presented;practical engineering analysis is taken,the successful application of the result to the engineering construction schedule management shows the feasibility and effectiveness in applying to of the method presented in this paper.