Study on Optimal Activity Duration in Fuzzy Network
|
Abstract:
In this paper, we establish a fuzzy model for solving optimal activity duration satisfied the prespecified project due date in fuzzy network, and present two level multi objective linear programming model of the fuzzy model. The optimal activity duration can be obtained by using hierarchical method. Finally,a numerical example is given.