Study on Optimal Activity Duration in Fuzzy Network
模糊网络的活动最优延续时间分析

Keywords: network scheduling,fuzzy network,project due date
网络计划
,模糊网络,工程完工期

Full-Text   Cite this paper   Add to My Lib

Abstract:

In this paper, we establish a fuzzy model for solving optimal activity duration satisfied the prespecified project due date in fuzzy network, and present two level multi objective linear programming model of the fuzzy model. The optimal activity duration can be obtained by using hierarchical method. Finally,a numerical example is given.