全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

The Analysis of Project Networks with Time-switch Constraints
具有时间转换约束的项目网络分析方法研究

Keywords: project networks,time-switch constraints,activity Pattern,critical Path,float time
项目网络
,时间转换约束,活动模式,关键道路,浮动时差

Full-Text   Cite this paper   Add to My Lib

Abstract:

In this paper, an amended two-phase algorithm is presented to analyze networks with a special time-switch constraint. Finally, an illustrative example is used to validate the algorithm.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133