全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Study on Project Payment Scheduling Problems with Bonus-Penalty Structure from Two Viewpoints
具有奖励惩罚结构的项目支付进度问题研究:双重角度

Keywords: bonus-penalty structure,project payment scheduling,mathematic model,simulated annealing heuristics
奖励惩罚结构
,支付进度安排,数学模型,模拟退火启发式算法

Full-Text   Cite this paper   Add to My Lib

Abstract:

The project payment scheduling problem with bonus-penalty structure is defined and its assumptions are identified firstly.Then the basic mathematic models of the problems are constructed from contractor's and client's viewpoints respectively and extended to the cases of time-based payment and cost-based payment.In addition,the influences of bonus-penalty structure on NPV of contractors and clients and how to evaluate bonus-penalty structure are discussed.And a special simulated annealing heuristics with two modules is developed as well.Ultimately,the outcomes of the paper are illustrated through an instance.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133