全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
生态学报  2010 

Principle analysis and method improvement on cost calculation in watershed ecological compensation
流域生态补偿标准中成本核算的原理分析与方法改进

Keywords: watershed ecological compensation,compensation standard,direct cost,opportunity cost
流域生态补偿
,补偿标准,直接成本,机会成本

Full-Text   Cite this paper   Add to My Lib

Abstract:

The equilibrium condition between supply and demand of ecosystem services in a watershed was discussed in the paper based on the marginal analysis. It was proved that the lower limit of ecological compensation standard is the sum of direct cost and opportunity cost. Theoretically if the compensation standard less than this limit, ecological compensation could not achieve the purpose to encourage the action of ecological conservation and environmental protection. Based on analysis above, current accounting scope and calculation method of direct cost and opportunity cost in watershed ecological compensation were summarized and the existing problems were analyzed. The common calculation framework and method of direct cost was put forward. Moreover, a classification-based method to account opportunity cost was set up to improve the accuracy, scientificity and acceptability in determination of watershed ecological compensation standard.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133