全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Bridge preventive maintenance based on life-cycle assessment

Keywords: bridge maintenance, life-cycle cost, time to damage, repair time, optimal maintenance schedule.

Full-Text   Cite this paper   Add to My Lib

Abstract:

a criterion for preventive maintenance scheduling (pms) is proposed based on the history of previous damage occurrences, duration of repairs or maintenance, and the development of cost functions. the pms method describes the performance of the bridge for the deterioration/damage events and maintenance actions during the bridge?s service life. the time to failure and repair time are modeled as random variables. sensitivity studies show that the maintenance cost by damage consequence, an indirect measure of the bridge importance, plays a significant role on the optimal maintenance period

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133