全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

生产建设项目防治指标与措施配置关系的研究
Research on the Relationship between Control Index of Development and Construction Projects and Measure Allocation

DOI: 10.12677/AEP.2014.46B005, PP. 34-39

Keywords: 生产建设项目,防治指标,措施配置
Development and Construction Projects
, Control Index, Measure Allocation

Full-Text   Cite this paper   Add to My Lib

Abstract:

本文在分析了生产建设项目防治措施布设原则的基础上,分析了影响防治目标达到因子,并对防治目标、防治指标、效益分析与措施配置关系进行了研究,提出防治目标是水土保持方案措施配置后必须达到的最低要求,效益分析是根据水土保持方案措施配置能够达到的防治指标,措施配置是达到防治目标的方法。

This article based on the analysis of the development and construction projects for control measures layout principle, analyzed the influence factor of the control goal, and researched control goal, control index, benefit analysis and measure allocation relation. It puts forward that control goal is the minimum requirement plan of soil and water conservation measures. Benefit analysis is control index to achieve the plan of soil and water conservation measures, and measures allocation is method to achieve control goal. 

References

[1]  蒲勇平 (2002) 关于水保方案编制中几个共性问题的探讨. 水土保持科技情报, 4, 25-26.
[2]  水利部水土保持监测中心 (2010) 生产建设项目水土保持准入条件研究.中国林业出版社, 北京.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133