全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

A fuzzy modeling for single machine scheduling problem with deteriorating jobs

Keywords: Scheduling , Sequencing , Single machine , Work in process , Job deterioration , Bi-objective , Fuzzy decision making

Full-Text   Cite this paper   Add to My Lib

Abstract:

This paper addresses a bi-criteria scheduling problem with deteriorating jobs on a single machine. We develop a model for a single machine bi-criteria scheduling problem (SMBSP) with the aim of minimizing total tardiness and work in process (WIP) costs. WIP cost increases as a job passes through a series of stages in the production process. Due to the uncertainty involved in real-world scheduling problems, it is sometimes unrealistic or even impossible to acquire exact input data. Hence, we consider the SMBSP under the hypothesis of fuzzy L-R processing time's knowledge and fuzzy L-R due date. The effectiveness of the proposed model and the denoted methodology is demonstrated through a test problem.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133