全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Related Literature Review: Project Triad—The Virtual Project Coordination

DOI: 10.4236/ojbm.2023.114089, PP. 1597-1608

Keywords: Coordination, OSEL, Project Triad, Virtual Team, VPC

Full-Text   Cite this paper   Add to My Lib

Abstract:

The project triad is a concept model of coordination that consists of three (3) leading project team players, such as the project client, consultant, and contractor, agreeing and embracing the transparency transaction in a virtual environment, that’s virtual project coordination (VPC). The main objective is to fill in the gap, issues, and problems in communication, specifically in coordination and cooperation. Moreover, to prevent the duplication of ideas, increase competitiveness, and seek improvement for operational effectiveness in virtual project management (VPM). This literature review will gather data from publications, studies, technical papers, etc., from 2013 to 2023 publications. The project coordination depends on how effective communication is used in the project. Therefore, the review analysis focuses on project communication, coordination, cooperation, delivery, uses, tools, and techniques. Mostly related to the latest coordination issue that leads to disputes and how cooperative the project team is, including the virtual environment. The research review will use statistical analysis under the guidelines with the processes of the C4 model (collect, check, calibrate, and complete), filter, process, and sort the gathered data. Then, take the objective (optimization), significance (importance), evaluation, and limitation (OSEL) of the research publication. As a result, a statistical analysis is most likely mentioned in the related publication with coordination issues; however, the effectiveness will depend on the software collaboration used in the 5D model for the project. Therefore, the project triad concept is necessary for the project, whether simple or complex, with the collaboration of related software. The relevant topic’s idea may be improved, optimized, and innovated to pursue this concept to realization and better application.

References

[1]  Adham, T. (2023). Investigating the Causes of Contractor-Related Delays in Construction Project and Mitigation Proposal. International Journal of Progressive Sciences and Technology (IJPSAT), 37, 646-670.
[2]  Anantatmula, V., & Rad, P. (2018). Role of Organizational Project Management Maturity Factors on Project Success. Engineering Management Journal, 30, 165-178.
https://doi.org/10.1080/10429247.2018.1458208
[3]  Arora, S. (2023). Project Failure: A Bad Communication (Case Study). International Journal of Management and Humanities (IJMH), 9, 5-7.
https://doi.org/10.35940/ijmh.E1553.019523
[4]  ASEM (2019). A Guide to the Engineering Management Body of Knowledge (5th ed.). EMBOK Guide, The American Society for Engineering Management (ASEM).
[5]  Badiru, A. (2008). Triple C Model of Project Management—Communication, Cooperation, and Coordination. CRC Press.
[6]  Bhat, S., Pande, N., & Ahuja, V. (2017). Virtual Team Effectiveness: An Empirical Study Using SEM. Procedia Computer Science, 122, 33-41.
https://doi.org/10.1016/j.procs.2017.11.338
[7]  Bizjak, M., & Faganel, A. (2020). Internal Communication in Global Project Teams. Management, 15, 179-206.
https://doi.org/10.26493/1854-4231.15.179-206
[8]  Bond-Barnard, T., Fltcher, L., & Steyn, H. (2017). Linking Trust and Collaboration in Project Teams to Project Management Success. International Journal of Managing Projects in Business, 11, 432-457.
https://doi.org/10.1108/IJMPB-06-2017-0068
[9]  Casey, V. (2010). Developing Trust in Virtual Software Development Team. Journal of Theoretical and Applied Electronic Commerce Research, 5, 41-58.
https://doi.org/10.4067/S0718-18762010000200004
[10]  Casey, V., & Richardson, I. (2008). Virtual Teams: Understanding the Impact of Fear. Software Process: Improvement and Practice, 13, 511-526.
https://doi.org/10.1002/spip.404
[11]  Chen, L., Manley, K., Lewis, J., Helfer, F., & Widen, K. (2018). Procurement and Governance Choices for Collaborative Infrastructure Projects. Journal of Construction Engineering and Management, 144, Article ID: 04018071.
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001525
[12]  Dinis, F., Sanhudo, L., Martins, J., & Ramos, N. (2020). Improving Project Communication in the Architecture, Engineering and Construction Industry: Coupling Virtual Reality and Laser Scanning. Journal of Building Engineering, 30, Article ID: 101287.
https://doi.org/10.1016/j.jobe.2020.101287
[13]  Du, J., Zhao, D., Issa, R., & Singh, N. (2020). BIM for Improved Project Communication Networks: Empirical Evidence from Email Logs. Journal of Computing in Civil Engineering, 34, Article ID: 04020027.
https://doi.org/10.1061/(ASCE)CP.1943-5487.0000912
[14]  Ekwuno, A., & Nel, H. (2022). Analyzing the Project Delay Causes in the South Africa Construction Industry. International Journal of Engineering Applied Sciences and Technology, 7, 15-73.
https://doi.org/10.33564/IJEAST.2022.v07i06.002
[15]  El Khatib, M., Al Hashimi, S., & Al Ketbi, M. (2023). Impact of Remote Work on Project Management Cases from UAE Construction Sector. Journal of Service Science and Management, 16, 30-43.
https://doi.org/10.4236/jssm.2023.161003
[16]  Erdos, F., & Nemeth, R. (2021). Demand for a 3D Virtual Collaboration Based Software Development Platform. In 12th IEEE International Conference on Cognitive Infocommunications (CogInfoCom 2021) (pp. 1-4). The Institute of Electrical and Electronics Engineers.
[17]  Farina, L., Danesi, E., Travaglini, A., Mancini, M., & Trucco, P. (2018). Integration of Constructability and Project Risk Management. Springer International Publishing AG.
https://doi.org/10.1007/978-3-319-58409-6_35
[18]  Garomsa, T., De Castro Argon, E., & Assefa, S. (2019). Concept of Value Engineering and Current Project Management Practice in Ethiopian Building Construction Projects. American Journal of Civil Engineering, 7, 1-8.
https://doi.org/10.11648/j.ajce.20190701.11
[19]  Hynes, G. (2019). Project Communication from Start to Finish: The Dynamics of Organizational Success. Business Expert Press.
[20]  Jha, S. (2010). The Project Manager’s Communication Toolkit. CRC Press.
https://doi.org/10.1201/9781439809969
[21]  Kanagarajoo, M., Fulford, R., & Standing, C. (2019). The Contribution of Social Media to Project Management. International Journal of Productivity and Performance Management, 69, 834-872.
https://doi.org/10.1108/IJPPM-09-2018-0316
[22]  Lappi, T., Aaltonen, K., & Kujala, J. (2018). The Birth of an ICT Project Alliance. International Journal of Managing Projects in Business, 12, 325-355.
https://doi.org/10.1108/IJMPB-02-2018-0036
[23]  McMahon, P. (2001). Virtual Project Management—Software Solutions for Today and the Future. CRC Press LLC.
[24]  Melander, L., & Tell, F. (2019). Inter-Firm and Intra-Firm Coordination of Buyer-Supplier Collaborations in New Product Development under Conflicts of Interest. Journal of Business & Industrial Marketing, 34, 850-861.
https://doi.org/10.1108/JBIM-09-2017-0216
[25]  Mesmer, B., Beruvides, M., Dixon, G., Gandhi, J., & Shah, H. (2023). The Engineering Management Handbook (3rd ed.). The American Society for Engineering Management (ASEM).
[26]  Musheke, M., & Phiri, J. (2021). The Effects of Effective Communication on Organizational Performance Based on the Systems Theory. Open Journal of Business and Management, 9, 659-671.
https://doi.org/10.4236/ojbm.2021.92034
[27]  Nevstad, K., Børve, S., Karlsen, A., & Aarseth, W. (2018). Understanding How to Succeed with Project Partnering. International Journal of Managing Projects in Business, 11, 1044-1065.
https://doi.org/10.1108/IJMPB-07-2017-0085
[28]  Nicholas, J., & Steyn, H. (2021). Project Management for Engineering, Business and Technology (6th ed.). Routledge.
[29]  Oberlender, G., Spencer, G., & Lewis, R. (2022). Project Management for Engineering and Construction: A Life-Cycle Approach (4th ed.). McGraw Hill.
[30]  Plowman, C., & Diffendal, J. (2020). Project Communication: A Critical Factor for Project Success. Business Expert Press, LLC.
[31]  PMI (2021). The Standard for Project Management and a Guide to the Project Management Body of Knowledge (7th ed.). PMBOK Guide, Project Management Institute (PMI).
[32]  Postavaru, N., Draghici, G., Filip, C., Mohammed, A., & Mohammed, S. (2019). Business Management Strategies for Business Development. Organization of the Territory and Planning of Construction Works. Ovidus University Annals Series: Civil Engineering.
https://doi.org/10.2478/ouacsce-2019-0005
[33]  Renzi, T. (2020). The Effect of Leadership Styles on Project Implementation. Open Journal of Leadership, 9, 198-213.
https://doi.org/10.4236/ojl.2020.94012
[34]  Savolainen, J., Saari, A., Mannisto, A., & Kahkonen, K. (2018). Indicators of Collaborative Design Management in Construction Projects. Journal of Engineering, Design and Technology, 16, 674-691.
https://doi.org/10.1108/JEDT-09-2017-0091
[35]  Schweiger, S., Knolechner, S., & Guttel, W. (2020). How Cooperation Reinforces Conflict over Time: The Role of Simplified Images and Disidentification. Project Management, 5, 62-76.
https://doi.org/10.1177/8756972819891281
[36]  Shen, W., Tang, W., Wang, Y., Duffield, C., Kin, F., Hui, P., & Zhang, L. (2021). Managing Interfaces in Large-Scale Projects: The Roles of Formal Governance and Partnering. Journal of Construction Engineering and Management, 147, 1-34.
https://doi.org/10.1061/(ASCE)CO.1943-7862.0002101
[37]  Shenhar, A., & Holzmann, V. (2017). The Three Secrets of Megaproject Success: Clear Strategic Vision, Total Alignment, and Adapting to Complexity. Project Management Journal, 48, 29-46.
https://doi.org/10.1177/875697281704800604
[38]  Sherif, A., & Abdelalim, A. (2023). Delay Analysis Techniques and Claim Assessment in Construction Projects. International Journal of Management and Commerce Innovations, 10, 316-325.
[39]  Trinh, M., & Feng, Y. (2020). Impact of Project Complexity on Construction Safety Performance: Moderating Role of Resilient Safety Culture. Journal of Construction Engineering and Management, 146, Article ID: 04019103.
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001758
[40]  Walker, R., Cardon, P., & Aritz, J. (2018). Enhancing Global Virtual Small Group Communication Skills. Journal of Intercultural Communication Research, 47, 421-433.
https://doi.org/10.1080/17475759.2018.1475292
[41]  Wu, G., Liu, C., Zhao, X., & Zuo, J. (2017). Investigating the Relationship between Communication-Conflict Interaction and Project Success among Construction Project Teams. International Journal of Project Management, 35, 1466-1482.
https://doi.org/10.1016/j.ijproman.2017.08.006
[42]  Xue, H., Zhang, S., Su, Y., Wu, Z., & Yang, R. (2018). Effect of Stakeholder Collaborative Management on Off-Site Construction Cost Performance. Journal of Cleaner Production, 184, 490-502.
https://doi.org/10.1016/j.jclepro.2018.02.258
[43]  Yang, J., Xia, S., Shang, J., Li, S., & Zhang, Z. (2019). Application of Three-Dimensional Visualization Technology in Project Management of Offshore Engineering Construction. Engineering, 11, 727-734.
https://doi.org/10.4236/eng.2019.1111047
[44]  Yang, X., Yu, M., & Zhu, F. (2020). Impact of Project Planning on Knowledge Integration in Construction Projects. Journal of Construction Engineering and Management, 146, Article ID: 04020066.
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001852
[45]  Ybañez, R., & De La Cruz, A. (2022). Multi Structures-Scales (MSS) in Project Execution Management (PEM). Open Journal of Business and Management (OJBM), 10, 2959-2973.
https://doi.org/10.4236/ojbm.2022.106146
[46]  Ybañez, R., Bautista, L., & De La Cruz, A. (2022). Virtual Project Management (VPM) in Project Execution. American Journal of Industrial and Business Management (AJIBM), 12, 1867-1912.
https://doi.org/10.4236/ajibm.2022.1212102
[47]  Zhang, L., Huang, S., & Peng, Y. (2018a). Collaboration in Integrated Project Delivery: The Effects of Trust and Formal Contracts. Engineering Management Journal, 30, 262-273.
https://doi.org/10.1080/10429247.2018.1498259
[48]  Zhang, R., Liue, A., & Chan, I. (2018b). Effects of Quality and Quantity of Information Processing on Design Coordination Performance. World Journal of Engineering and Technology, 6, 41-49.
https://doi.org/10.4236/wjet.2018.62B005

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133