基于PDCA循环的烟机设备搬迁管理模式探索与实践
|
Abstract:
传统设备搬迁模式存在搬迁周期长,搬迁后设备性能不稳定,影响车间生产能力等问题。本文结合烟机设备搬迁项目,运用PDCA循环方法,通过对工厂以往的搬迁流程进行调查分析,制定设备搬迁计划,优化设备搬迁流程,改进设备调试维护方法,实现搬迁效率和搬迁质量的提升,最终形成一个科学性、系统性、实施性强、适用性广的大型设备搬迁管理模式。
The traditional equipment relocation mode has some problems, such as long relocation cycle, unstable equipment performance after relocation, affecting workshop production capacity and so on. Combined with the relocation project of cigarette machine equipment, using the PDCA cycle method, through the investigation and analysis of the previous relocation process in the factory, this paper formulates the equipment relocation plan, optimizes the equipment relocation process, improves the equipment testing and maintenance methods, realizes the improvement of relocation efficiency and relocation quality, and finally forms an equipment relocation management mode that is scientific, systematic, practical and wide applicability.
[1] | 陈四贵. 项目管理[M]. 北京: 中国人民大学出版社, 2004: 178. |
[2] | 廖国桢. 工程搬迁管理[M]. 北京: 电子工业出版社, 2012: 45-50. |
[3] | 许琳. 卷烟企业易地搬迁项目进度管理模式研究[D]: [硕士学位论文]. 青岛: 中国海洋大学, 2009. |
[4] | 王文继. VWPT LT1设备搬迁项目进度管理研究[D]: [硕士学位论文]. 上海: 华东理工大学, 2016. |