横缝竖向止水布设对轴流式机组厂房应力的影响 Influence of vertical water stop layout for transverse joint on stress of axial flow unit hydropower house

Keywords: 横缝竖向止水,轴流式机组,电站厂房,有限元法,结构应力

Full-Text   Cite this paper   Add to My Lib

Abstract:

以轴流式机组厂房中间坝段为研究对象,计算分析电站厂房在不同横缝竖向止水布设形式下进出水口关键部位的应力,探究其规律性.研究结果表明,横缝上游止水设置在进水口偏下游侧、横缝下游竖向止水设置在出水口偏上游侧,可有效缓解厂房结构进出水口关键部位的应力.综合考虑结构应力及水电站厂房的适用性等各个因素,建议将上游竖向止水设置在距离厂房坝段上游面(0.7~0.9)B(B为厂房坝段上游面至胸墙下游面最小距离)处,下游竖向止水设置在距离下游面0.9 D(D为厂房坝段下游面至下游挡墙上游面的最小距离)处,可最大程度上降低结构的应力.研究成果为类似厂房结构横缝竖向止水布设提供参考

References

[1]  张存慧,马震岳,张运良.三峡右岸电站主厂房结构的振动应力分析[J].水力发电学报,2010,29(6):144-148.Zhang Cunhui,Ma Zhenyue,Zhang Yunliang.Dynamic stress analysis of Three Gorges right bank powerhouse[J].Journal of Hydroelectric Engineering,2010,29(6):144-148.
[2]  李守义,安学民,杨胜,等.灯泡贯流式水电站厂房水平止水布置研究[J].水资源与水工程学报,2009,20(1):68-71.Li Shouyi,An Xuemin,Yang Sheng,et al.Study on the water seal layout at the bulb tubular powe station[J].Journal of Water Resources&Water Engineering,2009,20(1):68-71.
[3]  Jia Jinsheng,Zheng Cuiying,Hao Jutao,et al.Studies for the transverse joint waterstops at Xiaowan dam[J].International Journal on Hydropower and Dams,2006,13(1):50-58.
[4]  Hao Jutao.Adaptability of slab joint waterstops to very high CFRDs[J].International Journal on Hydropower and Dams,2010,17(1):78-83.
[5]  周炎.水电站厂房止水设施效果调查分析[J].华东水电技术,1990,12(1):14-20.Zhou Yan.Investigation and analysis of the effect of the sealing facilities in hydropower station powerhouse[J].East China Hydropower Technology,1990,12(1):14-20.
[6]  徐芝纶.弹性力学简明教程[M].第四版.北京:高等教育出版社,2013.Xu Zhilun.Elastic Mechanics Concise Tutorial[M].4th Edition.Beijing:Higher Education Press,2013.
[7]  邹建奇,崔健.材料力学[M].北京:清华大学出版社,2015.Zou Jianqi,Cui Jian.Material Mechanics[M].Beijing:Tsinghua University Press,2015.
[8]  中华人民共和国水利部.SL 744-2016水工建筑物荷载设计规范[S].北京:中国水利水电出版社,2016.Ministry of Water Resources of People's Republic of China.SL 744-2016Specification for Load Design of Hydraulic Structures[S].Beijing:China Water Conservancy and Hydropower Press,2016.
[9]  陈本龙,慕洪友,湛正刚.高尾水作用下厂房混凝土结构的防裂抗渗研究[J].红水河,2016,35(4):28-31.Chen Benlong,Mu Hongyou,Zhan Zhenggang.Study on crack and leakage prevention for powerhouse concrete structure under high tail-water level effect[J].Hongshui River,2016,35(4):28-31.
[10]  薛晶晶,张振华,陈帅.某电站厂房楼板裂缝成因三维有限元静力分析[J].水电能源科学,2011,29(2):72-75.Xue Jingjing,Zhang Zhenhua,Chen Shuai.Static cause analysis of floor cracks for powerhouse of hydropower station with 3Dfinite element method[J].Water Resources and Power,2011,29(2):72-75.
[11]  邹金波.大坝横缝止排水系统施工工艺改进的探讨[J].水力发电,2014,40(9):20-21.Zou Jinbo.Construction technology improvements on water sealing and drainage system of dam transverse joints[J].Water Power,2014,40(9):20-21.
[12]  黄春基.水电站厂房止水设施效果调查分析[J].华东水电技术,1990,12(4):53-60.Huang Chunji.Investigation and analysis of the effect of the sealing facilities in hydropower station powerhouse[J].East China Hydropower Technology,1990,12(4):53-60.
[13]  周伟.河床式水电站厂房坝段横缝止水布置形式研究[D].西安:西安理工大学,2008.Zhou Wei.Study on the transverse joint sealing arrangement form in the riverbed-hydropower station powerhouse[D].Xi'an:Xi'an University of Technology,2008.
[14]  张辉东,王日宣,王元丰.大型水电站厂房结构地震时程响应非线性数值模拟[J].水力发电学报,2007,26(4):96-102.Zhang Huidong,Wang Rixuan,Wang Yuanfeng.Seismic time history and non-linear numerical simulation of large-scale powerhouse structure[J].Journal of Hydroelectric Engineering,2007,26(4):96-102.
[15]  龚曙光,边炳传.有限元基本理论及应用[M].武汉:华中科技大学出版社,2013.Gong Shuguang,Bian Bingchuan.Basic Theory and Application of Finite Element[M].Wuhan:Huazhong University of Science and Technology Press,2013.
[16]  张启灵,伍鹤皋,李端有.水电站地面厂房抗震措施研究[J].水力发电学报,2012,31(5):184-190.Zhang Qiling,Wu Hegao,Li Duanyou.Aseismic measure of surface hydropower house[J].Journal of Hydroelectric Engineering,2012,31(5):184-190.
[17]  向功兴,杨亚军,伍鹤皋,等.河床式厂房止水布置和混凝土蜗壳座环柔度[J].武汉大学学报(工学版),2010,43(1):46-50.Xiang Gongxing,Yang Yajun,Wu Hegao,et al.Study of layout of water seals for powerhouse in river channel and flexibility of stay rings for concrete spiral case[J].Engineering Journal of Wuhan University,2010,43(1):46-50.
[18]  李守义,肖静.河床式水电站厂房横缝止水布置形式研究[J].水力发电学报,2014,33(5):165-168.Li Shouyi,Xiao Jing.Study on waterstop arrangements of transverse joints of hydropower house in river channel[J].Journal of Hydroelectric Engineering,2014,33(5):165-168.
[19]  水电勘测设计标准化技术委员会.NB/T 35011-2013水电站厂房设计规范[S].北京:中国电力出版社,2013.Hydropower Survey and Design Standardization Technical Committee.NB/T 35011-2013Design Specification for Powerhouses of Hydropower Stations[S].Beijing:China Electric Power Press,2013.
[20]  张玲丽,谭振江,韩前龙,等.银盘水电站预应力蜗壳结构设计[J].水电能源科学,2016,34(6):131-134.Zhang Lingli,Tan Zhenjiang,Han Qianlong,et al.Structure design of pre-stressed spiral case of Yinpan Hydropower Station[J].Water Resources and Power,2016,34(6):131-134.
[21]  程帅,李守义,司政,等.水电站厂房自振频率与影响因素的关联度分析[J].南水北调与水利科技,2017,15(3):190-196.Cheng Shuai,Li Shouyi,Si Zheng,et al.Relational grade analysis for influencing factors and the natural vibration frequency of hydropower house[J].Southto-North Water Transfers and Water Science&Technology,2017,15(3):190-196.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133